• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Erosion And Sediment Control Certification Questions And Answers 100% Accurate

Document preview thumbnail
Preview 2 out of 15 pages

EROSION AND SEDIMENT CONTROL CERTIFICATION QUESTIONS AND ANSWERS 100% ACCURATEEROSION AND SEDIMENT CONTROL CERTIFICATION QUESTIONS AND ANSWERS 100% ACCURATE The following type of material is used in the installation of silt fence and super silt fence: a. woven slit film b. woven monofilament c. nonwoven d. none of the above - ANSWER-a. woven slit film Per the ASTM D-4355 test method, all geotextiles used in MD for erosion and sediment control must have an ultraviolet retention strength rating of at least: a. 70% b. 95% c. 60% d. 50% - ANSWER-a. 70% In determining a stone classification size, the stone must be a well graded mixture

Content preview

EROSION AND SEDIMENT CONTROL
CERTIFICATION QUESTIONS AND
ANSWERS 100% ACCURATE
The following type of material is used in the installation of silt fence and super silt fence:
a. woven slit film
b. woven monofilament
c. nonwoven
d. none of the above - ANSWER-a. woven slit film

Per the ASTM D-4355 test method, all geotextiles used in MD for erosion and sediment
control must have an ultraviolet retention strength rating of at least:
a. 70%
b. 95%
c. 60%
d. 50% - ANSWER-a. 70%

In determining a stone classification size, the stone must be a well graded mixture
where 50% of the pieces by weight are below the weight of the midsize indicated as
d50.
a. true
b. false - ANSWER-a. true

A local jurisdiction may have stricter requirements than the State for material
specifications.
a. true
b. false - ANSWER-a. true

The minimum gauge wire for use in gabion baskets is:
a. 7
b. 12
c. 15
d. 11 - ANSWER-d. 11

The best way to prevent erosion is:
a. double up the silt fence
b. install a good working sediment trap
c. minimize the disturbed area and quickly re-establish vegetative cover
d. schedule construction when rain is not forecasted - ANSWER-c. minimize the
disturbed area and quickly re-establish vegetative cover

, Topsoiling is always required when permanently stabilizing an area.
a. true
b. false - ANSWER-b. false

Mulching, in conjunction with seeding, helps:
a. protect the seed
b. retain moisture in the soil
c. prevent erosion
d. all of the above - ANSWER-d. all of the above

Asphalt binders may be as tack with mulching on sites under five acres.
a. true
b. false - ANSWER-b. false

When spreading lime and fertilize:
a. it can be broadcast along with the seed and mulch
b. should be incorporated into the top 3-5 inches of soil
c. uneven distribution is acceptable as far as it is incorporated in the top 3-5 inches of
soil
d. all of the above - ANSWER-b. should be incorporated into the top 3-5 inches of soil

Temporary seed (annual seed) and mulch is only for application of durations
__________ months or less.
a. three
b. nine
c. six
d. twelve - ANSWER-c. six

Following initial soil disturbance or re-disturbance, permanent or temporary stabilization
must be completed within __________ calendar days for all perimeter dikes, swales,
ditches, perimeter slopes, and all slopes steeper than 3:1; and __________ calendar
days for all other disturbed or graded areas on the project site not under active grading.
a. 1, 2
b. 3, 7
c. 7, 14
d. 14, 21 - ANSWER-b. 3, 7

Adequate vegetative cover requires __________ percent ground cover.
a. 50
b. 80
c. 95
d. 100 - ANSWER-c. 95

An earth dike must be stabilized within 3 days of installation.
a. true
b. false - ANSWER-a. true

Document information

Uploaded on
June 24, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$20.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1
3.9
(460)
Sold
1706
Followers
1073
Items
18498
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions