Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CEPSCI PRACTICE TEST WITH CORRECT SOLUTIONS

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
24-06-2025
Written in
2024/2025

CEPSCI PRACTICE TEST WITH CORRECT SOLUTIONSCEPSCI PRACTICE TEST WITH CORRECT SOLUTIONSCEPSCI PRACTICE TEST WITH CORRECT SOLUTIONS Administered by the US environmental protection agency (EPA) Created the NPDES - ANSWER-1972 clean water act Amendment to CWA CALLED WATER QUALITY ACT - ANSWER-1987 South Carolina is NPDES delegated state. - ANSWER-NPDES in south carolina SCDHEC - ANSWER-NPDES regulations are administered by

Show more Read less
Institution
CEPSCI
Course
CEPSCI

Content preview

CEPSCI PRACTICE TEST WITH
CORRECT SOLUTIONS

Administered by the US environmental protection agency (EPA) Created the NPDES -
ANSWER-1972 clean water act

Amendment to CWA CALLED WATER QUALITY ACT - ANSWER-1987

South Carolina is NPDES delegated state. - ANSWER-NPDES in south carolina

SCDHEC - ANSWER-NPDES regulations are administered by

stormwater discharges from construction sites - ANSWER-CGP authorizes

land disturbing activities greater than or equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone -
ANSWER-Who must obtain NPDES coverage

operator-person or company for a particular discharge - ANSWER-NPDES permits are
issued to

-has day to day operational control to ensure compliance with SWPP
-typically the owner or developer - ANSWER-primary permittee

submit NOI, Preparation of the C_SWPPP - ANSWER-primary permittee responsibilites

individual lot owner or residential builder that conducts land disturbing activity limited to
an individual lot or group of lots as part of approved LCP of development - ANSWER-
Secondary permittee


Once every month - ANSWER-Inspection frequency for sites that have reached
temporary stablization

linear activites may limit access to disturbed areas, in such cases representative
inspections may be performed - ANSWER-Linear site inspection

personnel must investigate BMP's along the site for 0.25 miles above and below each
access point where the site intersects with -roadway - undisturbed right of way - other
similar feature- Condition along each inspected segment are considered
"respresentative" along that reach of construction - ANSWER-representative
inspections (linear site inspection)

, 0.5 inches or greater - ANSWER-permittees must record rainfall events of

maintained in rain log located as part of the OS-SWPPP - ANSWER-where should
rainfall records be kept

must on Contractor Certification- D-0437 - ANSWER-contractors

SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local
Approvals, USACE approvals, Critical area permit(coast) - ANSWER-On-Site SWPPP

a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC must
be retained at site or electronically accessible - ANSWER-OS_SWPPP

minor modifications made directly in the field,do not need approval by DHEC- additional
BMP's, removal of disturbed areas - ANSWER-minor modification to ON-SWPPP

must be made by qualified individual and submitted to DHEC or appropriate delegated
entity for approval - ANSWER-major modifications to OS-SWPPP

include a phased stormwater management plan which identifies all BMP's and grading
work conducted during a specific portion of the sites construction sequence. Each
phase identified on at least one separate plan sheet. - ANSWER-Phased plan
requirement > 5

at least two separate plan phases are required - initial land disturbance phase -
stabilization phase - ANSWER-Phased plan requirement < 10 but > 5 acres

at least 3 separate plan phases are required - initial land disturbance phase -
construction phase - stabilization phase - ANSWER-Phased plan requirement ≥ 10
acres

1. areas of site disturbed by construction activity and areas used for storage of materials
exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are
inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking. -
ANSWER-All compliance inspection must include invesg. of, at a minimum of 5 of the
following

at least once a week or within 24 hours of end of storm event >0.5 inches - ANSWER-
inspection frequency after construction begins

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
June 24, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • cepsci practice test
$17.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
CEPSCI CERTIFICATION (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) EXAM PACKAGE DEAL (BUNDLE) WITH COMPLETE SOLUTIONS!!
-
15 2025
$ 50.99 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1697
Member since
3 year
Number of followers
1073
Documents
18441
Last sold
6 days ago
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

459 reviews

5
217
4
79
3
92
2
21
1
50

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions