Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CEPSCI PRACTICE TEST|| 111 QUESTIONS AND ANSWERS 100% CORRECT

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
24-06-2025
Written in
2024/2025

CEPSCI PRACTICE TEST|| 111 QUESTIONS AND ANSWERS 100% CORRECTCEPSCI PRACTICE TEST|| 111 QUESTIONS AND ANSWERS 100% CORRECT 1972 clean water act - ANSWER-Administered by the US environmental protection agency (EPA) Created the NPDES 1972 clean water act - ANSWER-Administered by the US environmental protection agency (EPA) Created the NPDES 1987 - ANSWER-Amendment to CWA CALLED WATER QUALITY ACT NPDES in south carolina - ANSWER-South Carolina is NPDES delegated state. NPDES regulations are administered by - ANSWER-SCDHEC CGP authorizes - ANSWER-stormwater discharges from construction sites

Show more Read less
Institution
CEPSCI
Course
CEPSCI

Content preview

CEPSCI PRACTICE TEST|| 111
QUESTIONS AND ANSWERS 100%
CORRECT
1972 clean water act - ANSWER-Administered by the US environmental protection
agency (EPA) Created the NPDES

1987 - ANSWER-Amendment to CWA CALLED WATER QUALITY ACT

NPDES in south carolina - ANSWER-South Carolina is NPDES delegated state.

NPDES regulations are administered by - ANSWER-SCDHEC

CGP authorizes - ANSWER-stormwater discharges from construction sites

Who must obtain NPDES coverage - ANSWER-land disturbing activities greater than or
equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone

NPDES permits are issued to - ANSWER-operator-person or company for a particular
discharge

primary permittee - ANSWER--has day to day operational control to ensure compliance
with SWPP
-typically the owner or developer

primary permittee responsibilites - ANSWER-submit NOI, Preparation of the C_SWPPP

Secondary permittee - ANSWER-individual lot owner or residential builder that conducts
land disturbing activity limited to an individual lot or group of lots as part of approved
LCP of development

De-watering inspection/maintenace - ANSWER-ongoing inspection is necessary in
order to detect any malfunctions or operation of equipment.
-Discharge areas should be inspected when other practices are inspected.

Buffer zones - ANSWER-Provide and maintain natural buffers around surface waters
during construction activities.

Buffers Maintenance - ANSWER-proper maintenance begins with flagging of the buffer
and includes proper inspection and maintenance of all BMPs discharging to the buffer
zone.

, Silt fence cannot be used for - ANSWER-velocity control

Erosion prevention BMPs - ANSWER--final stabilization
-Riprap for channel stabilization
-outlet protection
-Dust control
-Polyacrylamide (PAM)

Surface roughening DESCRIPTION - ANSWER-horizontal depressions, steps or
grooves that run parallel to contour of land

contractors - ANSWER-must on Contractor Certification- D-0437

On-Site SWPPP - ANSWER-SCDHEC CGP, NOI, NPDES coverage approval letter,
Contractor Certifications, Local Approvals, USACE approvals, Critical area
permit(coast)

OS_SWPPP - ANSWER-a copy of signed and certified SWPPP, NOI, and CGP
coverage letter from DHEC must be retained at site or electronically accessible

minor modification to ON-SWPPP - ANSWER-minor modifications made directly in the
field,do not need approval by DHEC- additional BMP's, removal of disturbed areas

major modifications to OS-SWPPP - ANSWER-must be made by qualified individual
and submitted to DHEC or appropriate delegated entity for approval

Phased plan requirement > 5 - ANSWER-include a phased stormwater management
plan which identifies all BMP's and grading work conducted during a specific portion of
the sites construction sequence. Each phase identified on at least one separate plan
sheet.

Phased plan requirement < 10 but > 5 acres - ANSWER-at least two separate plan
phases are required - initial land disturbance phase - stabilization phase

Phased plan requirement ≥ 10 acres - ANSWER-at least 3 separate plan phases are
required - initial land disturbance phase - construction phase - stabilization phase

All compliance inspection must include invesg. of, at a minimum of 5 of the following -
ANSWER-1. areas of site disturbed by construction activity and areas used for storage
of materials exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are
inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
June 24, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$23.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
CEPSCI CERTIFICATION (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) EXAM PACKAGE DEAL (BUNDLE) WITH COMPLETE SOLUTIONS!!
-
15 2025
$ 50.99 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1 West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1697
Member since
3 year
Number of followers
1073
Documents
18441
Last sold
6 days ago
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.9

459 reviews

5
217
4
79
3
92
2
21
1
50

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions