• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Erosion and Sediment Control Test 1 Questions With All Correct Answers 2025

Document preview thumbnail
Preview 2 out of 10 pages

Erosion and Sediment Control Test 1 Questions With All Correct Answers 2025

Content preview

Erosion and Sediment Control Test 1
Questions With All Correct Answers
2025
2-year, 24-hour storm even CORRECT ANSWERS maximum 24-hour precipitation
event with a probable recurrence interval of once in two years as defined by the
National Weather Service and Technical Paper No. 40, "Rainfall Frequency Atlas of the
US" May 1961 or equivalent regional rainfall probability information developed there
from

24-hour Precipitation Event CORRECT ANSWERS amount of precipitation which
occurs within any 24 hour period

AEMA CORRECT ANSWERS Alabama Environmental Management Act, Code of
Alabama 1975

Alabama Handbook CORRECT ANSWERS current edition of the Alabama Handbook
for Erosion Control, Sediment Control, and Stormwater Management on Construction
Sites and Urban Areas published by the Alabama Soil and Water Conservation
Committee (ASWCC) at the time permit coverage is obtained

ADEM CORRECT ANSWERS Alabama Department of Environmental Management

Agricultural Practices CORRECT ANSWERS practices commensurate with the size of
the farming operation that are implemented in a manner that meet or exceed the Natural
Resources Conservation Service technical standards and guidelines, including but not
limited to farm ponds that are constructed for the primary purpose of irrigation and/or
watering livestock, terraces, grassed waterways, vegetative filter strips, cropland grade
stabilized measures drainage tiles, underground outlets, land leveling, dike/diversion
structures and other grade stabilized structures

AWPCA CORRECT ANSWERS Alabama Water Pollution Control Act

Best Management Practices (BMPs) CORRECT ANSWERS implementation and
continued maintenance of appropriate structural and non-structural practices and
management strategies to prevent and minimize the introduction of pollutants to
stormwater and to treat stormwater to remove pollutants prior to discharge

Borrow Area "Pit" CORRECT ANSWERS the activity of removing material (soil, gravel,
sand) from one area to use in another area. For the purposes of this
permit, this activity is solely in conjunction with the project requesting permit coverage
and the material is not to be sold for profit. The borrow

, area and associated activity shall be located within a two-mile radius of the project
requesting permit coverage to be considered as part of the
project and will open and close with the project requesting permit coverage

Chronic and Catastrophic Precipitation CORRECT ANSWERS precipitation events
which may result in failure of the properly designed, located, implemented,
and maintained BMPs or other structure/practices required by this permit. Catastrophic
precipitation conditions means any single event of
significant total volume, or of increased intensity and shortened duration, that exceeds
normally expected or predicted precipitation over the time
period that the disturbance is planned or is ongoing, as determined by the Department.
Catastrophic conditions could also include tornadoes,
hurricanes, or other climatic conditions which could cause failure due to winds or
mechanical damage. Chronic precipitation is also that series of
wet-weather conditions over a limited time-period which does not provide any
opportunity for emergency maintenance, reinstallation, and
corrective actions and which equals or exceeds the volume of normally expected or
predicted precipitation for the time period that the disturbance
is planned or is ongoing

Common Plan of Development or Sale CORRECT ANSWERS any announcement or
piece of documentation (e.g., sign, public notice, or hearing, sales pitch,
advertisement, drawing, permit application, zoning request, computer design, etc.) or
physical demarcation (e.g., boundary signs, lot stakes,
surveyor markings, etc.) indicating construction activities may occur on a specific plot

Construction CORRECT ANSWERS any land disturbance or discharges of pollutants
associated with, or the result of building, excavation, land clearing, grubbing,
placement of fill, grading, blasting, reclamation, areas in which construction materials
are stored in association with a land disturbance or handled
above ground and other associated areas including, but not limited to, construction site
vehicle parking, equipment or supply storage areas, material
stockpiles, temporary office areas, and access roads. Construction also means
significant pre-construction land disturbance activities performed
in support or in advance of construction activity including, but not limited to, land
clearing, excavation, removal of existing buildings, dewatering,
and geological testing. For the purposes of this Permit, any activity related to mining
operations is excluded

Construction Activity CORRECT ANSWERS the disturbance of soils associated with
clearing, grading, excavating, filling of land, or other similar activities which
may result in soil erosion. For the purposes of this Permit, construction activity does not
include mining operations, agricultural and silvicultural
practices. However, construction activity does include the construction of agricultural
buildings

Document information

Uploaded on
June 23, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ElevatedExcellence
3.8
(178)
Sold
951
Followers
505
Items
18297
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions