• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

SWT301 PT1 UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 15 pages

SWT301 PT1 UPDATED ACTUAL Exam Questions and CORRECT Answers You work as a tester in a software house and you concurrently work on two projects. One of them is an internal tool for on-line room reservation, done within an agile life cycle. The other one is a commercial software for managing hospital patients' data, conducted in the waterfall model. In one-month, new versions of both systems will be released. You don't have time to perform all the planned tests for both systems. You decide to focus on testing the commercial system. A. This is a bad decision, because testing commercial project will be much more expensive than testing the internal one B. This is a good decision, because the commercial software is much more important for the company than the internal system C. This is a bad decision, because critical defects can occur in both systems, and one of them w

Content preview

SWT301 PT1 UPDATED ACTUAL Exam
Questions and CORRECT Answers
You work as a tester in a software house and you concurrently work on two projects. One of
them is an internal tool for on-line room reservation, done within an agile life cycle. The other
one is a commercial software for managing hospital patients' data, conducted in the waterfall
model. In one-month, new versions of both systems will be released. You don't have time to
perform all the planned tests for both systems. You decide to focus on testing the commercial
system.


A. This is a bad decision, because testing commercial project will be much more expensive than
testing the internal one
B. This is a good decision, because the commercial software is much more important for the
company than the internal system
C. This is a bad decision, because critical defects can occur in both systems, and one of them will
not be tested
D. This is a good decision, because the waterfall model requires testing during the end of the -
CORRECT ANSWER - C. This is a bad decision, because critical defects can occur in
both systems, and one of them will not be tested


fb chọn b


Which of the following requirements is testable?
A. There should be no faults in the safety-critical components of the system.
B. The platform must be designed with portability as a key feature
C. The system is required to be easy for users to navigate and use.
D. The required response time for the designated design load should not exceed one second. -
CORRECT ANSWER - D. The required response time for the designated design load
should not exceed one second.


Test planning has which of the following major tasks?
i. Determining the scope and risks, and identifying the objectives of testing.

, ii. Determining the test approach (techniques, test items, coverage, identifying and interfacing
the teams involved in testing, testware)
iii. Reviewing the Test Basis (such as requirements, architecture, design, interface)
iv. Determining the exit criteria.


i, ii, iv are true and iii is false
i, ili, iv are true and ii is false
i, ii are true and iii, iv are false

i, ii, iv are true and i is false - CORRECT ANSWER - i, ii, iv are true and iii is false


The inputs for developing a test plan are taken from
A. Support plan
B. Business plan
C. Project plan

D. None of the above - CORRECT ANSWER - C. Project plan


A social media platform is planning to roll out a new feature that allows users to upload and
share videos. The development team has implemented the video upload functionality, and the
product manager is concerned about the potential impact on the existing image upload
functionality. They want to ensure that the introduction of video uploads does not negatively
affect the core functionality of image uploads. Which test should be performed in this situation?
A. Re-test
B. Performance test
C. Functional test

D. Regression test - CORRECT ANSWER - D. Regression test


Which of the following BEST distinguishes the terms "validation" and "verification"
A. Verification is confirmation through the provision of subjective evidence that the specified
requirements have been met while validation confirmation through the provision of subjective
evidence that the designs for a specific intended use have been met

Document information

Uploaded on
June 23, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(240)
Sold
1653
Followers
108
Items
119940
Last sold
7 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions