CMRP Practice UPDATED ACTUAL Exam Questions and CORRECT Answers Replacement Asset Value (RAV) - CORRECT ANSWER - defined as the cost that would be incurred, in today's dollars, to replace the facility and equipment in its current configuration. Overall Equipment Effectiveness (OEE) definition - CORRECT ANSWER - metric for measuring how well a process is operating by evaluating the three major process components: availability, performance efficiency (rate/speed) and quality. The process can be a single piece of equipment, a manufacturing cell, a production line or a plant Overall Equipment Effectiveness (OEE) equation - CORRECT ANSWER - Availability × Performance Efficiency × Qualit

Content preview

CMRP Practice UPDATED ACTUAL Exam
Questions and CORRECT Answers
Replacement Asset Value (RAV) - CORRECT ANSWER - defined as the cost that would be
incurred, in today's dollars, to replace the facility and equipment in its current configuration.


Overall Equipment Effectiveness (OEE) definition - CORRECT ANSWER - metric for
measuring how well a process is operating by evaluating the three major process components:
availability, performance efficiency (rate/speed) and quality. The process can be a single piece of
equipment, a manufacturing cell, a production line or a plant


Overall Equipment Effectiveness (OEE) equation - CORRECT ANSWER - Availability ×
Performance Efficiency × Quality


Availability - CORRECT ANSWER - defined as the percentage of time that the process is
actually operating (uptime) compared to when it is scheduled to operate


Performance efficiency (rate/speed) - CORRECT ANSWER - defined as the percentage of
Actual Run Rate/Cycle Time to the Best Run Rate/Cycle Time


Quality - CORRECT ANSWER - defined as the percentage of "First Pass, First Time"
Saleable Production to the Actual Production


Actual Production - CORRECT ANSWER - total quantity of production produced in the
given time period, regardless of its quality


Lagging Indicator - CORRECT ANSWER - An indicator that measures performance after the
business or process result starts to follow a particular pattern or trend


Leading Indicator - CORRECT ANSWER - An indicator that measures performance before
the business or process result starts to follow a particular pattern or trend

,Three (3) sets of measurable components that make up the maintenance and reliability process -
CORRECT ANSWER - 1. Management processes and behaviors (mission and vision, people
skills)
2. Operational execution (operations, design and maintenance)
3. Manufacturing performance (availability, quality, cost and benefits)


mean metrics - CORRECT ANSWER - metrics that describe the Reliability, Availability and
Maintainability (RAM) characteristics of a component, asset or even facility


Inherent Availability - CORRECT ANSWER - measure of the variables inherent in the design
that affect availability. In the calculation of downtime, it usually includes only active repair time.
It does not include preventive maintenance time and administrative or logistic delays, but does
include corrective maintenance downtime


Inherent Availability Formula - CORRECT ANSWER - Ai = MTBF / (MTBF + MTTR)
Where MTBF = Mean Time Between Failures
And MTTR = Mean Time to Repair (corrective maintenance only)


Achieved Availability - CORRECT ANSWER - probability that an item, when used under
design conditions in an ideal support environment, will perform satisfactorily. It includes both
active repair time and preventive maintenance time, but excludes administrative and logistic
delay times


Achieved Availability Formula - CORRECT ANSWER - Aa = MTBM / (MTBM + MDTM)
Where MTBM = Mean Time Between Maintenance
And MDTM = Mean Downtime for Maintenance


Operational Availability - CORRECT ANSWER - probability that an item, when used under
design conditions in an operational environment, will perform satisfactorily. It includes active
repair time, preventive maintenance time and administrative and logistic delays and represents
the availability that is actually experienced

, Operational Availability Formula - CORRECT ANSWER - Ao = MTBM / (MTBM + MDT)
Where MTBM = Mean Time Between Maintenance
And MDT = Mean Down Time


Equipment Availability - CORRECT ANSWER - defined by The Association for
Manufacturing Technology as the percentage of potential production time during which
equipment is operable. The term is applied to a single piece of manufacturing equipment (or
several machines acting as a unit)


Equipment Availability Formula - CORRECT ANSWER - = [Production Time / Potential
Production Time] x 100


Point Availability - CORRECT ANSWER - probability that a device, system or component
will be operational at any random point in time


Point Availability Formula - CORRECT ANSWER - At = R(t) + ∫ t R(t - u)m(u)du
Where R(t) = Probability of operating during time (t)
m(u) = The renewal density function
And u = The last repair time (0 < u < t)


Average Availability - CORRECT ANSWER - average availability over a specific time
period when an asset is available for use. It is also called mean availability


Limiting Availability - CORRECT ANSWER - the limit of the point availability function as
time approaches infinity. It is also called steady-state availability


Limiting Availability Formula - CORRECT ANSWER - A∞ = lim At
t→∞

Document information

Uploaded on
June 23, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(240)
Sold
1649
Followers
108
Items
119940
Last sold
4 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions