The lean ratio of an extension ladder - ANSWER✅✅ 4:1
According to AHERA, to complete a response action of a non-NESHAP size project,
how many samples must be taken with results of what? - ANSWER✅✅ 5 samples
taken inside with results of each <0.0 f/cc
What are the notification requirements in Virginia? - ANSWER✅✅ 20 calendar days
for any project greater than 10 sq feet or linear feet
In what jurisdiction do individuals need an asbestos supervisor or working linsense -
ANSWER✅✅ Need a license everywhere
Type of bond that would ensure that the general contractor will compensate
subcontractors for labor and materials - ANSWER✅✅ Performance Bond
Minimum respiratory protection on a class 1 asbestos project with no NEA -
ANSWER✅✅ Full face air purifying respirator
, What is the maximum content permitted in the work area where an air purifying
respirator is being worn? - ANSWER✅✅ 23.5%
Chest XRays must be evaluated by what class reader? - ANSWER✅✅ Class B
What is the APF for a full face air purifying respirator - ANSWER✅✅ 50
Friable ACM is any material that can be: - ANSWER✅✅ Crushed, pulverized,
reduced to powder by hand pressure when dry
The OSHA permissible exposure limit is - ANSWER✅✅ 0.1 f/cc over 8 hours TWA
According to ASHERA, how many air samples must be taken for final clearance for
NESHAP size project? - ANSWER✅✅ 13 samples (5 inside, 5 outside, 2 fields blanks ,
one sealed blank)TEM
Laboratories that perform PLM and TEM must be accredited by - ANSWER✅✅
National Voluntary Laboratory Accreditation Program
AHERA is for - ANSWER✅✅ Public schools K-12
What is the notification requirement for asbestos projects in DC - ANSWER✅✅ 10
working days prior to start NESHAP size projects and any project over 18 square feet
of flooring. Building owner to notify tenants no less than 30 days prior to start of the
project in writing
What is a NESHAP sized project - ANSWER✅✅ 160 square feet, 260 linear feet, or
35 cubic feet
The competent person must inspect the work suits of the crew at least: -
ANSWER✅✅ Once a shift
In Maryland, the asbestos project notification must be posted when and where? -
ANSWER✅✅ Three days prior to any asbestos project, at all entrances and exits
from the work site.
NESHAP regulations provide definitions for - ANSWER✅✅ Renovations, Adequately
Wet, and Demolitions
The definition of PACM is - ANSWER✅✅ TSI and surfacing material found in a
building constructed no later than 1980
The OSHA Asbestos in construction standard required employees to maintain
exposure monitoring results for how many years? - ANSWER✅✅ 30 years
What is the safe level of asbestos exposure? - ANSWER✅✅ There is no safe limit