• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

CNS 220 Construction Materials Exam 1 Questions Answered Correctly Graded A+

Document preview thumbnail
Preview 1 out of 2 pages

CNS 220 Construction Materials Exam 1 Questions Answered Correctly Graded A+ Beam - Answers 1.a long, sturdy piece of squared timber or metal spanning an opening or part of a building, usually to support the roof or floor above Column - Answers an upright pillar, typically cylindrical and made of stone or concrete, supporting an entablature, arch, or other structure or standing alone as a monument Dimensions of a 2 x 4 - Answers 1 1/2 in x 3 1/2 in Cubic Feet in a cubic Yard? - Answers 27 Concrete Slump - Answers - 12 Inches Tall -Fill with Concrete then take slump off too measure slump -Slump is the difference in height -Testing for the Workability of the slump How much larger are Building Plans to Floor Plans - Answers 50% What gives the surface that is to be applied to every wall, floor and ceiling in the building - Answers Room Finish Schedule Who pays the bill? Who prepares the plans? Who are the plans for? - Answers Owner, Designers, Builders Site Plan - Answers A fly overview of the building site, showing the property lines, utilities and site circulation (roads and sidewalks) Floor Plan - Answers A horizontal view cut 4 feet above floor level Building Section - Answers A vertical cut through the building shows how all the components fit together, and is very important to the Builder How are plans organized? - Answers The order the building is constructed What is poche? - Answers a French term referring to the solid spaces between walls. On an architectural floor plan, the poche is the parts in solid black Room numbers and door numbers start at the - Answers Front Door

Content preview

CNS 220 Construction Materials Exam 1 Questions Answered Correctly Graded A+

Beam - Answers 1.a long, sturdy piece of squared timber or metal spanning an opening or part of a
building, usually to support the roof or floor above

Column - Answers an upright pillar, typically cylindrical and made of stone or concrete, supporting an
entablature, arch, or other structure or standing alone as a monument

Dimensions of a 2 x 4 - Answers 1 1/2 in x 3 1/2 in

Cubic Feet in a cubic Yard? - Answers 27

Concrete Slump - Answers - 12 Inches Tall

-Fill with Concrete then take slump off too measure slump

-Slump is the difference in height

-Testing for the Workability of the slump

How much larger are Building Plans to Floor Plans - Answers 50%

What gives the surface that is to be applied to every wall, floor and ceiling in the building - Answers
Room Finish Schedule

Who pays the bill? Who prepares the plans? Who are the plans for? - Answers Owner, Designers,
Builders

Site Plan - Answers A fly overview of the building site, showing the property lines, utilities and site
circulation (roads and sidewalks)

Floor Plan - Answers A horizontal view cut 4 feet above floor level

Building Section - Answers A vertical cut through the building shows how all the components fit
together, and is very important to the Builder

How are plans organized? - Answers The order the building is constructed

What is poche? - Answers a French term referring to the solid spaces between walls. On an architectural
floor plan, the poche is the parts in solid black

Room numbers and door numbers start at the - Answers Front Door

Mechanical, Electrical and Plumbing - Answers Is always constructed last

A dashed line indicates - Answers Something above, below or hidden

Every sheet in a set of plans are drawn with what tool - Answers Architectural Scale

Document information

Uploaded on
June 19, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.5
(76)
Sold
500
Followers
16
Items
32943
Last sold
6 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions