Stormwater Exam Walmart Exam
Questions With Accurate Solutions 2025
The 1970's law that set into place the regulation of stormwater is: CORRECT
ANSWERS The Clean Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: CORRECT ANSWERS NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? CORRECT ANSWERS Discharge from contaminated groundwater
The Notice of termination can filed when: CORRECT ANSWERS All construction
activity, inside and outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: CORRECT ANSWERS Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater CORRECT ANSWERS Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: CORRECT ANSWERS Groundcover
Temporary stabilization should be implemented CORRECT ANSWERS Immediately on
all disturbed areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is CORRECT ANSWERS To remove
sediment from construction site vehicles and minimize trackout
Common types of erosion include all of the following except CORRECT ANSWERS
Sedimentation
Which of the following is NOT a beneficial use of water? CORRECT ANSWERS
Flushing a spill down a storm drain
When installing and maintaining a check dam make sure: CORRECT ANSWERS The
low point (overflow) of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should: CORRECT
ANSWERS Install filter fabric under rock and similar materials placed within the
stormwater
Questions With Accurate Solutions 2025
The 1970's law that set into place the regulation of stormwater is: CORRECT
ANSWERS The Clean Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: CORRECT ANSWERS NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? CORRECT ANSWERS Discharge from contaminated groundwater
The Notice of termination can filed when: CORRECT ANSWERS All construction
activity, inside and outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: CORRECT ANSWERS Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater CORRECT ANSWERS Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: CORRECT ANSWERS Groundcover
Temporary stabilization should be implemented CORRECT ANSWERS Immediately on
all disturbed areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is CORRECT ANSWERS To remove
sediment from construction site vehicles and minimize trackout
Common types of erosion include all of the following except CORRECT ANSWERS
Sedimentation
Which of the following is NOT a beneficial use of water? CORRECT ANSWERS
Flushing a spill down a storm drain
When installing and maintaining a check dam make sure: CORRECT ANSWERS The
low point (overflow) of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should: CORRECT
ANSWERS Install filter fabric under rock and similar materials placed within the
stormwater