1. True/False B) False
According to the NERC Functional Model, there is no
difference between the function and the entity.
A) True
B) False
2. True/False B) False
Analysis type questions are designed to be the least
complex from a human cognitive process.
A) True
B) False
3. True/False B) False
A Transmission Service Provider is an entity that both
owns and operates transmission facilities on the Bulk
Electric System.
A) True
B) False
4. True/False A) True
The NERC Functional Model is designed so that the
functions of Generator Owner and Generator Opera-
tor can be performed by two different entities.
A) True
B) False
, NERC Certification Exam
Study online at https://quizlet.com/_hf6bjt
5. How many forms of identification are required 2
when taking the NERC System Operator Certification
exam?
A) 4
B) 9
C) 1
D) 2
6. The NERC came into existence as a result of the Elec- 1967
tric Power Reliability Act of what year?
A) 1958
B) 2005
C) 1967
D) 1997
7. How many certification credentials does NERC have 4
examinations for?
A) 2
B) 4
C) 6
D) 3
8. Match the acronym with the appropriate organiza- 1. FERC Federal Energy
tion. Regulatory Commission
2. NERC North American
FERC North American Electric Reliability Corp Electric Reliability Corpora-
tion
NERC Florida Reliability Coordinating Council
3. FRCC Florida Reliability
Coordinating Council
FRCC Reliability First
4. RF Reliability First
, NERC Certification Exam
Study online at https://quizlet.com/_hf6bjt
RF Federal Energy Regulatory Commission
9. True/False False
Balancing Authorities are responsible to ensure that
transmission facilities are operated within the limits
that are established by the Transmission Owners.
10. The first power pool in the industry was created in Pennsylvania-New Jersey
1927 and was known as which of the following? Interconnection
11. How many Interconnections are there in North Amer- A) 4
ica?
A) 4
B) 6
C) 2
D) 8
12. True/False C) 60Hz
All four Interconnections operate at ____ Hz, but are
not in synchronization with each other.
A) 59Hz/False
B) 62Hz/True
C) 60HZ/True
D) 60.02Hz/False
13. How many High-Voltage Direct Current transmission B) 0
lines are there in operation between the Western and
ERCOT Interconnections?
A) 2
B) 0
NERC Certification Exam
QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT
Study online at https://quizlet.com/_hf6bjt
ANSWERS) GET IT RIGHT!!
1. True/False B) False
According to the NERC Functional Model, there is no
difference between the function and the entity.
A) True
B) False
2. True/False B) False
Analysis type questions are designed to be the least
complex from a human cognitive process.
A) True
B) False
3. True/False B) False
A Transmission Service Provider is an entity that both
owns and operates transmission facilities on the Bulk
Electric System.
A) True
B) False
4. True/False A) True
The NERC Functional Model is designed so that the
functions of Generator Owner and Generator Opera-
tor can be performed by two different entities.
A) True
B) False
, NERC Certification Exam
Study online at https://quizlet.com/_hf6bjt
5. How many forms of identification are required 2
when taking the NERC System Operator Certification
exam?
A) 4
B) 9
C) 1
D) 2
6. The NERC came into existence as a result of the Elec- 1967
tric Power Reliability Act of what year?
A) 1958
B) 2005
C) 1967
D) 1997
7. How many certification credentials does NERC have 4
examinations for?
A) 2
B) 4
C) 6
D) 3
8. Match the acronym with the appropriate organiza- 1. FERC Federal Energy
tion. Regulatory Commission
2. NERC North American
FERC North American Electric Reliability Corp Electric Reliability Corpora-
tion
NERC Florida Reliability Coordinating Council
3. FRCC Florida Reliability
Coordinating Council
FRCC Reliability First
4. RF Reliability First
, NERC Certification Exam
Study online at https://quizlet.com/_hf6bjt
RF Federal Energy Regulatory Commission
9. True/False False
Balancing Authorities are responsible to ensure that
transmission facilities are operated within the limits
that are established by the Transmission Owners.
10. The first power pool in the industry was created in Pennsylvania-New Jersey
1927 and was known as which of the following? Interconnection
11. How many Interconnections are there in North Amer- A) 4
ica?
A) 4
B) 6
C) 2
D) 8
12. True/False C) 60Hz
All four Interconnections operate at ____ Hz, but are
not in synchronization with each other.
A) 59Hz/False
B) 62Hz/True
C) 60HZ/True
D) 60.02Hz/False
13. How many High-Voltage Direct Current transmission B) 0
lines are there in operation between the Western and
ERCOT Interconnections?
A) 2
B) 0