What should a business case include? - (answer)B - Background
O - Options
B- Benefits
CA - Commercial Aspects
R - Risks
T - Timescales
What are the 5 aspects of the PRAM? - (answer)Initiate
Identify
Assess
Plan responses
Implement responses
What are the 5 phases in the extended project life cycle? - (answer)Concept
Definition
Development
Handover and Closure
Operations
Who are potential stakeholders within a project? - (answer)Project Sponsor
Project Team
Users
,APM PMQ FINAL EXAM 2025/2026 BANK CURRENTLY TESTING 2 VERSIONS (VERSION A
AND B) AND STUDY GUIDE COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+
Suppliers
Customers
Senior Management
What are the 5 steps within the information management process? - (answer)Collection
Storage
Dissemination
Archiving
Destruction
What are the steps of the requirements management process? - (answer)Capture
Analyse
Justify
Baseline
What are the steps of the change control process? - (answer)- Submit Change Request
- Review viability of taking request further
- Assessment of feasibility and impact of the proposed change
- Decision
What are potential sources of change? - (answer)Internal:
- Technical Error
- Incorrect Estimate
- Resourcing Issues
External:
, APM PMQ FINAL EXAM 2025/2026 BANK CURRENTLY TESTING 2 VERSIONS (VERSION A
AND B) AND STUDY GUIDE COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+
- Business Justification
- Requirements change
- Technology/Market Shift
What is the requirements model? - (answer)Business Need (Why)
Features (How)
Requirements (What)
Acceptance Criteria
What are the steps of the configuration management process? - (answer)Planning
Identification
Control
Status Accounting
Audit
What are 2 types of breakdown structure? - (answer)Work Breakdown Structure (WBS)
Product Breakdown Structure (PBS)
What is a Work Breakdown Structure (WBS)? - (answer)a comprehensive list of all activities needed to
complete a project.
What is a Product Breakdown Structure (PBS)? - (answer)This focuses on the deliverables that are
needed to deliver the project. This can be broken down further into tasks within a WBS.
What are 5 types of report? - (answer)Progress
Quality
Risk
AND B) AND STUDY GUIDE COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+
What should a business case include? - (answer)B - Background
O - Options
B- Benefits
CA - Commercial Aspects
R - Risks
T - Timescales
What are the 5 aspects of the PRAM? - (answer)Initiate
Identify
Assess
Plan responses
Implement responses
What are the 5 phases in the extended project life cycle? - (answer)Concept
Definition
Development
Handover and Closure
Operations
Who are potential stakeholders within a project? - (answer)Project Sponsor
Project Team
Users
,APM PMQ FINAL EXAM 2025/2026 BANK CURRENTLY TESTING 2 VERSIONS (VERSION A
AND B) AND STUDY GUIDE COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+
Suppliers
Customers
Senior Management
What are the 5 steps within the information management process? - (answer)Collection
Storage
Dissemination
Archiving
Destruction
What are the steps of the requirements management process? - (answer)Capture
Analyse
Justify
Baseline
What are the steps of the change control process? - (answer)- Submit Change Request
- Review viability of taking request further
- Assessment of feasibility and impact of the proposed change
- Decision
What are potential sources of change? - (answer)Internal:
- Technical Error
- Incorrect Estimate
- Resourcing Issues
External:
, APM PMQ FINAL EXAM 2025/2026 BANK CURRENTLY TESTING 2 VERSIONS (VERSION A
AND B) AND STUDY GUIDE COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+
- Business Justification
- Requirements change
- Technology/Market Shift
What is the requirements model? - (answer)Business Need (Why)
Features (How)
Requirements (What)
Acceptance Criteria
What are the steps of the configuration management process? - (answer)Planning
Identification
Control
Status Accounting
Audit
What are 2 types of breakdown structure? - (answer)Work Breakdown Structure (WBS)
Product Breakdown Structure (PBS)
What is a Work Breakdown Structure (WBS)? - (answer)a comprehensive list of all activities needed to
complete a project.
What is a Product Breakdown Structure (PBS)? - (answer)This focuses on the deliverables that are
needed to deliver the project. This can be broken down further into tasks within a WBS.
What are 5 types of report? - (answer)Progress
Quality
Risk