• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

CSE 360 - Exam 1 | Actual study | Questions and verified Answers

Document preview thumbnail
Preview 1 out of 3 pages

CSE 360 - Exam 1 | Actual study | Questions and verified Answers

Content preview

CSE 360 - Exam 1 | Actual study |
Questions and verified Answers
Process - ANSW-a structured set of activities required to develop a software system. Think of it like an
"object"
Process Model - ANSW-A simplified representation of the activities and relationships in a process, think
of it like a "class"
Elements/Activities - ANSW-1. Requirements
2. Modeling/Design
3. Construction
4. Testing
5. Deployment/Delivery
Types of Processes - ANSW-1. Plan-based methods (classical)
2. Agile methods (okay w/ changes)
Plan-based models - ANSW-1. Waterfall
2. V-model
3. Incremental
4. Spiral
5. Prototype
Agile methods - ANSW-1. SCRUM
2. Kanaban
3. XP (extreme programming)
4. Feature Driven Development
Definition of Plan-based: - ANSW-progress that is measured against a plan which is good for engineers
Definition of agile: - ANSW-planning that is incremental and taking step by step with a lot of changes
along the way which is good for customers
Waterfall Model - ANSW-separate and distinct phases of specification and development that must be
complete before moving on to next step. A linear model for large systems but have a disadvantage of
being difficult of accommodating changes after process is underway
Difference between waterfall model vs v-model - ANSW-in waterfall model, the testing activities are
carried out after the development activities are over. On the other hand in V model, testing activities
start with the first stage itself. In other words, waterfall model is a continuous process, while the V model
is a simultaneous process.
Incremental Modeling: - ANSW-grandparent to Agile, because you are working in steps and splitting the
activities in several parts
prototype modeling - ANSW-helps with requirements but it is garbage
Incremental vs Prototyping? - ANSW-In Incremental, you are making a product but in prototyping you
are making garbage

Document information

Uploaded on
June 10, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EduSprint
3.9
(8)
Sold
62
Followers
6
Items
7080
Last sold
5 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions