• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

NICET Level III Water Based Layout Comprehensive Questions (Frequently Tested) with Verified Answers

Document preview thumbnail
Preview 3 out of 19 pages

NICET Level III Water Based Layout Comprehensive Questions (Frequently Tested) with Verified Answers

Content preview

NICET Level III Water Based
Layout Comprehensive
Questions (Frequently Tested)
with Verified Answers
General Conditions - Answer: What is not included in the technical specification?



•contract

•specifications

•contract drawings - Answer: Bid documents include?



General Conditions - Answer: Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety
requirements, barricades, fencing, insurance and bond requirements, ect.



Supplementary Conditions - Answer: Addendums, time schedules, working days allowed, delay
agreements, payment schedules



Construction Specifications Institute (CSI) - Answer: Specifications typically use what format?



Contractors - Answer: Construction manager concept is when the owner contracts with the construction
manager who oversees ____________ working on the project



Design-Build Concept - Answer: Sometimes referred to as a turn-key type agreement or contract?



general contractor - Answer: Multiple Prime Contractor Method has the intent is eliminate the
middleman __________ __________.



•architectural/structural contractor

•mechanical contractor

,•electrical contractor - Answer: Multiple prime contractor method involve more than one prime
contractor which consist of?



•federal government

•general services administration (GSA)

•large companies - Answer: Who commonly uses the multiple prime contractor method?



Owner, architect, general contractor, subcontractor - Answer: Traditional method contract uses the
typical chain of command which is?



•open bid method

•bid-by invitation procedure

•direct contractor selection - Answer: General contractors can be chosen in a number of different ways
which is?



General category and supplementary conditions - Answer: Contract conditions is divided into two
categories which is?



Addendum - Answer: Changes to the contract or other modifications.



•up-front payments

•progress payments

•lump sum - Answer: Types of payment schedules are?



Bidding requirements, sample forms, conditions of the contract and specifications, including general
conditions and supplementary conditions - Answer: What comprises the project manual?



•contract itself

•contract conditions

•specifications

, •drawings - Answer: Contract documents include:



Preliminary, bid, approval, construction, as-built - Answer: Drawings have different stages which are?



Request for proposal (RFP) - Answer: Oftentimes a project will begin with a _________.



•certified value specialist

•owner's representatives

•designers and consultants

•the construction team

•cost estimator

•building management staff

•third-party (independent) reviewers - Answer: Value-engineering team typically consist of?



•Information gathering

•brainstorming

•analysis

•development

•recommendations - Answer: Value-engineering typically goes through phases which are?



Planning stage - Answer: At what stage does value-engineering provide the most benefit?



Value = Function / Cost - Answer: Value-engineering equation is:



Low cost and high value - Answer: Value-engineering cost vs value goal is?



Giving careful consideration to all options, without sacrificing the project's goals. - Answer: Value-
engineering of a project involves:

Document information

Uploaded on
June 10, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.1
(74)
Sold
223
Followers
27
Items
18055
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions