The Architect, Engineers and Consultants are all members of the _________.
a. Facilities group
b. Design Team
c. Installation firm
d. Management Team b. Design Team
What best practice should a Technology Manager use when managing AV stock and inventory?
a. Ensure the proper amount of warehouse space is available for all inventory
b. Check in orders as they arrive
c. Ensure that the total value of stock and inventory does not exceed a specific amount
d. Keep track of the equipment and supplies the company has on hand what is on order and
what is on site d. Keep track of the equipment and supplies the company has on hand what
is on order and what is on site
The main purpose of an initial site survey is to:
a. Verify assumptions, and identify any challenges with the installation
of the audio visual systems
b. Layout the physical locations of the equipment chosen for the project
c. Coordinate with allied trades and the owner's rep
d. Review system costs, including equipment, engineering, labor, and miscellaneous items
included in the proposal a. Verify assumptions, and identify any challenges with the
installation
of the audio visual systems
,While evaluating a potential audio/video conference room site, you notice the HVAC system
appears to be introducing a substantial amount of noise into the environment. What should be
your first course of action?
a. Tell the customer that the HVAC noise will help mask the audio conferencing system for the
nearby cubicles.
b. Obtain RC or NC measurements of the HVAC noise and provide to the design team to
articulate the implications to the client's site.
c. Ask the client for the HVAC system schematics
d. Advise the customer to shut off the HVAC system during system usage. b. Obtain RC or NC
measurements of the HVAC noise and provide to the design team to articulate the implications
to the client's site.
In the needs analysis pyramid what is used to define tasks that will be used to define the scope
of the project?
a. Functions and Features
b. End User Needs
c. Applications
d. The Program Report c. Applications
Please select the appropriate resolution for an UHD display.
a. 1920 x 1200
b. 1920 x 1080
c. 3840 x 2160
d. 4096 x 3072 c. 3840 x 2160
Optimal viewing angles that can affect display location are known as ____.
, a. Angles of incidence
b. Display factors
c. Sightlines
d. Optical angles C. Sightlines
The top view drawing is also known as a___
a. Plan view
b. Elevation
c. Title block
d. Detail drawing a. Plan View
Which is NOT presented in the program report:
a. Executive Summary
b. Detailed list of equipment
c. Budgets
d. Infrastructure Considerations b. Detailed list of equipment
AV professionals determine the end user's needs by examining three things: the required
applications, the tasks, and the:
a. Overall design concept
b. Budget
c. Technologies
d. Functions to support the applications d. Functions to support the applications
The Architect, Engineers and Consultants are all members of the _________.
a. Facilities group
b. Design Team
c. Installation firm
d. Management Team b. Design Team
What best practice should a Technology Manager use when managing AV stock and inventory?
a. Ensure the proper amount of warehouse space is available for all inventory
b. Check in orders as they arrive
c. Ensure that the total value of stock and inventory does not exceed a specific amount
d. Keep track of the equipment and supplies the company has on hand what is on order and
what is on site d. Keep track of the equipment and supplies the company has on hand what
is on order and what is on site
The main purpose of an initial site survey is to:
a. Verify assumptions, and identify any challenges with the installation
of the audio visual systems
b. Layout the physical locations of the equipment chosen for the project
c. Coordinate with allied trades and the owner's rep
d. Review system costs, including equipment, engineering, labor, and miscellaneous items
included in the proposal a. Verify assumptions, and identify any challenges with the
installation
of the audio visual systems
,While evaluating a potential audio/video conference room site, you notice the HVAC system
appears to be introducing a substantial amount of noise into the environment. What should be
your first course of action?
a. Tell the customer that the HVAC noise will help mask the audio conferencing system for the
nearby cubicles.
b. Obtain RC or NC measurements of the HVAC noise and provide to the design team to
articulate the implications to the client's site.
c. Ask the client for the HVAC system schematics
d. Advise the customer to shut off the HVAC system during system usage. b. Obtain RC or NC
measurements of the HVAC noise and provide to the design team to articulate the implications
to the client's site.
In the needs analysis pyramid what is used to define tasks that will be used to define the scope
of the project?
a. Functions and Features
b. End User Needs
c. Applications
d. The Program Report c. Applications
Please select the appropriate resolution for an UHD display.
a. 1920 x 1200
b. 1920 x 1080
c. 3840 x 2160
d. 4096 x 3072 c. 3840 x 2160
Optimal viewing angles that can affect display location are known as ____.
, a. Angles of incidence
b. Display factors
c. Sightlines
d. Optical angles C. Sightlines
The top view drawing is also known as a___
a. Plan view
b. Elevation
c. Title block
d. Detail drawing a. Plan View
Which is NOT presented in the program report:
a. Executive Summary
b. Detailed list of equipment
c. Budgets
d. Infrastructure Considerations b. Detailed list of equipment
AV professionals determine the end user's needs by examining three things: the required
applications, the tasks, and the:
a. Overall design concept
b. Budget
c. Technologies
d. Functions to support the applications d. Functions to support the applications