DEQ Exam Questions With Correct Answers
/ / / / / /
The
/Virginia
/Stormwater
/Management
/Program
/is
/authorized
/by
/the
/______
/and
/administered
/through
/the
/______ /-
/correct
/answer(s)
/✔✔
/Virginia
/Stormwater /Management /Act, /Virginia /Stormwater /Management /Program /Regulation
VPDES
/Permit/Construction /GP /authorizes /discharge /of /stormwater /from /construction /activities /that
/are /- /correct /answer(s) /✔✔ /greater /than /or /equal /to /an /acre
The
/Stormwater
/Management
/Act
/requires
,/the
/State
/Water
/Control /Board /to /- /correct /answer(s) /✔✔ /permit, /regulate, /and /control /stormwater /runoff
DEQ /has /___ /days /to /complete /review /of /real /or /potential /inter-
jurisdictional /impacts /upon /request /- /correct /answer(s) /✔✔ /90
The
/Stormwater
/Management
/Act
/requires
/the
/following
/individuals
/to
/obtain
/and
/maintain /
a
/certificate
/of /competency /- /correct /answer(s) /✔✔ /staff /of /a /stormwater /program, /anyone /contracted /by
/a /VSMP /authority, /standard /and /specification /holders
The
/dual
/certificate
/will /expire /three /years /from /- /correct /answer(s) /✔✔ /the /latest /date /of /the /certificates
SWM
/plan
/must
, /be
/approved /by /___ /before /land /disturbance /- /correct /answer(s) /✔✔ /VSMP /program /authority
The /water /quality /criteria /sets /a /site-
based
/load
/limit
/of
/____ /of /total /phosphorus /for /new /development /- /correct /answer(s) /✔✔ /0.41 /lbs/acre/year
The /phosphorus /load /limit /uses /the /- /correct /answer(s) /✔✔ /10% /impervious /cover
Part
/II /
B
/and
/II /
C
/water
/quantity /criteria /addresses /- /correct /answer(s) /✔✔ /channel /protection /and /flood /protection
Which
/two /plans /in /the /SWPPP /must /be /approved? /- /correct /answer(s) /✔✔ /SWM /plan, /ESC /plan
Does
/the /SWM /plan /address /runoff /during /or /after /construction? /- /correct /answer(s) /✔✔ /post-
construction
What
/is
/the
/lower