The hole for temping asphalt trucks should be located where -
ANSWER-Hole located in the middle third of length of truck; 6-10
inches above the bed
Temping asphalt on the top - ANSWER-At engineer's discretion
Asphalt Temperature Master Range - ANSWER-+-30; reject loads
outside
Temp every load monitored if - ANSWER-Mix within master range
Differes for a single load from established temp by +-25°F
Avg of five loads differes by +-15°F
Monitor until within tolerance
Tack Distributor without a calibration chart - ANSWER-If they don't
have a calibration chart you can not use them to distribute tack
, 2|Page
Application rate of tack for close graded mixes - ANSWER-
Normal: 0.02-0.08 gal/yd^2
Must apply temperature correction factor
Calibration chart for distributor of tack - ANSWER-Must be done
by a reliable and recognized firm
Chart provided to engineer prior to use
Know the temperature of asphalt cement being used for Tack coat
Measuring tack levels - ANSWER-Stick the distributor before and
after spraying tack
Use calibration chart for Distributor to determine amount of
asphalt in truck before and after spraying
Formula for finding the length of a tacked road - ANSWER-Find
length of tacked road
Station - station = station lineal feet
or
FDOT ASPHALT PAVING LEVEL 1 EXAM LATEST 2025 ACTUAL EXAM
WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS
(100% VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR
VERIFIED|| ||BRANDNEW!!!||
The hole for temping asphalt trucks should be located where -
ANSWER-Hole located in the middle third of length of truck; 6-10
inches above the bed
Temping asphalt on the top - ANSWER-At engineer's discretion
Asphalt Temperature Master Range - ANSWER-+-30; reject loads
outside
Temp every load monitored if - ANSWER-Mix within master range
Differes for a single load from established temp by +-25°F
Avg of five loads differes by +-15°F
Monitor until within tolerance
Tack Distributor without a calibration chart - ANSWER-If they don't
have a calibration chart you can not use them to distribute tack
, 2|Page
Application rate of tack for close graded mixes - ANSWER-
Normal: 0.02-0.08 gal/yd^2
Must apply temperature correction factor
Calibration chart for distributor of tack - ANSWER-Must be done
by a reliable and recognized firm
Chart provided to engineer prior to use
Know the temperature of asphalt cement being used for Tack coat
Measuring tack levels - ANSWER-Stick the distributor before and
after spraying tack
Use calibration chart for Distributor to determine amount of
asphalt in truck before and after spraying
Formula for finding the length of a tacked road - ANSWER-Find
length of tacked road
Station - station = station lineal feet
or