Terms in this set (256)
How high can 20 feet
lumber be
stacked?
Who can be Inspection staff
assigned to
complaints that
aren't that
serious?
, 40lbs or less are mounted 5 feet
How high are from ground
fire extinguishers Greater than 40lbs are mounted 3.5
mounted? feet from ground
Clearance of 4 inches from ground
What are the Fire Alarm Control Unit
electronics that
monitor the
wiring of an
alarm system?
How often are Tested annually, extensive repair or
proprietary modification
system-large
commercial,
group of
commonly
owned facilities
tested?
Phase 1: single room
What are the
Phase 2: entire zone
different
Phase 3: entire floor, then floor
evacuation
above
phases?
Phase 4: entire building
, Engineered Use panels, adhesives, and metal
wood products fasteners
How is the Group B Division 2
nursing home
classified?
What is the 150 feet long with clearance of 13 ft
clearance for a 6 inches
fire lane?
Curbs painted red with white
How are fire
lettering, street signs white with red
lanes marked?
lettering
What should be complaint records
reviewed before
conducting an
inspection?
What type of Operational Permits
permit allows a
person or group
to conduct
operations for a
specified time?
comprehensive questions and
verified detailed solution|100%
CORRECT!!
Save
Terms in this set (256)
How high can 20 feet
lumber be
stacked?
Who can be Inspection staff
assigned to
complaints that
aren't that
serious?
, 40lbs or less are mounted 5 feet
How high are from ground
fire extinguishers Greater than 40lbs are mounted 3.5
mounted? feet from ground
Clearance of 4 inches from ground
What are the Fire Alarm Control Unit
electronics that
monitor the
wiring of an
alarm system?
How often are Tested annually, extensive repair or
proprietary modification
system-large
commercial,
group of
commonly
owned facilities
tested?
Phase 1: single room
What are the
Phase 2: entire zone
different
Phase 3: entire floor, then floor
evacuation
above
phases?
Phase 4: entire building
, Engineered Use panels, adhesives, and metal
wood products fasteners
How is the Group B Division 2
nursing home
classified?
What is the 150 feet long with clearance of 13 ft
clearance for a 6 inches
fire lane?
Curbs painted red with white
How are fire
lettering, street signs white with red
lanes marked?
lettering
What should be complaint records
reviewed before
conducting an
inspection?
What type of Operational Permits
permit allows a
person or group
to conduct
operations for a
specified time?