NCCCO Practice
Crane configuration includes:
A. reeving, boom length, counterweight,
on outriggers, on rubbers, extensions or
jibs stowed or mounted, off sets, wire
rope type or construction
B. hoist drum speeds, line pull, wire rope A
size and rigging
C. load charts, LMI, axle weights and
center of gravity
D. drum rotation indicator, anti-two block,
axle lock outs, and positive house lock
How does the operator determine the
manufacturers recommended rope for
the crane?
A. count the sheaves in the boom tip and
divide the potential parts into the cranes
capacity, then determine the proper care
B. read the manufacturer load chart or B
operator manual
C. measure the rope and determine ca-
pacity according to size
D. measure the wire rope and sheave
groove to be sure of the proper rope for
the crane
What is the main purpose of mid-point
suspension pendants?
A. to relieve the load on the bottom when
it is being raised
A
B. to absorb the shock that comes with
dynamic loading
C. to add structural integrity to the boom
D. to increase tipping capacities
The main purpose of a gantry or a mast
on a crane is
A. to decrease the parts of boom hoist
C
line on the block
B. to increase boom hoist speed
C. to increase the crane'e leverage on
1/6
, NCCCO Practice
the boom
D. to decrease the boom hoist speed
When using a mobile crane on a barge,
the crane's load capacity chart shall be:
A. replaced by a duty cycle chart
B
B. replaced by a list chart
C. de-rated to 50%
D. de-rated to 60%
Blocking can be placed under the ends
of tracks to:
A. stop the crane from sliding unexpect-
edly
B. stop crane from traveling unexpected-
D
ly
C. increase the crane's stability when op-
erating over side
D. increase the crane's stability when op-
erating over front or back
A crawler crane is based on
___________ stability of static load
A. 100%
C
B. 85%
C. 75%
D. 20%
What quadrant produces the least
amount of ground pressure on a lattice
crawler?
A. side A
B. front
C. corner
D. rear
When a crawler crane is on a barge the
list chart must be provided by the:
A. employer
D
B. crane owner
C. superintendent
D. manufacturer
2/6
Crane configuration includes:
A. reeving, boom length, counterweight,
on outriggers, on rubbers, extensions or
jibs stowed or mounted, off sets, wire
rope type or construction
B. hoist drum speeds, line pull, wire rope A
size and rigging
C. load charts, LMI, axle weights and
center of gravity
D. drum rotation indicator, anti-two block,
axle lock outs, and positive house lock
How does the operator determine the
manufacturers recommended rope for
the crane?
A. count the sheaves in the boom tip and
divide the potential parts into the cranes
capacity, then determine the proper care
B. read the manufacturer load chart or B
operator manual
C. measure the rope and determine ca-
pacity according to size
D. measure the wire rope and sheave
groove to be sure of the proper rope for
the crane
What is the main purpose of mid-point
suspension pendants?
A. to relieve the load on the bottom when
it is being raised
A
B. to absorb the shock that comes with
dynamic loading
C. to add structural integrity to the boom
D. to increase tipping capacities
The main purpose of a gantry or a mast
on a crane is
A. to decrease the parts of boom hoist
C
line on the block
B. to increase boom hoist speed
C. to increase the crane'e leverage on
1/6
, NCCCO Practice
the boom
D. to decrease the boom hoist speed
When using a mobile crane on a barge,
the crane's load capacity chart shall be:
A. replaced by a duty cycle chart
B
B. replaced by a list chart
C. de-rated to 50%
D. de-rated to 60%
Blocking can be placed under the ends
of tracks to:
A. stop the crane from sliding unexpect-
edly
B. stop crane from traveling unexpected-
D
ly
C. increase the crane's stability when op-
erating over side
D. increase the crane's stability when op-
erating over front or back
A crawler crane is based on
___________ stability of static load
A. 100%
C
B. 85%
C. 75%
D. 20%
What quadrant produces the least
amount of ground pressure on a lattice
crawler?
A. side A
B. front
C. corner
D. rear
When a crawler crane is on a barge the
list chart must be provided by the:
A. employer
D
B. crane owner
C. superintendent
D. manufacturer
2/6