plans or action taken by an agency
Quality that provides confidence that a
assurance is product or service with be
defined as satisfactory/adequate
I-15
,A Quality the framework necessary for
Assurance construction Quality Assurance
program serves implementation
as I-18
The making and agency and industry personnel
revision of QA (engineers, inspectors, technicians)
specs should I-19
include...
The 6 elements True
used in "design I-22
bid build" QA
programs are
the same as
"Design build"
construction QA
programs
Quality control Sampling, testing and visual
activities inspection
include... I-24
, -are Project Specific
- Address specific processes for
QC plans ... individual categories of work on a
construction process
I-25
Acceptance is the transportation agency
the I-26
responsibility of
...
the absolute threshold values for
Engineering
individual test results
limits are ...
I-29
Quality measures
QA specs use
I-28
identify discrepancies or
The purpose of differences in testing procedures
IA is to... or equipment
I-34
IA comparison split samples
is performed on I-34
...
EXAM QUESTIONS WITH
COMPLETE SOLUTION GUIDE (A+
GRADED 100% VERIFIED) LATEST
VERSION 2025!!
Save
Terms in this set (81)
plans or action taken by an agency
Quality that provides confidence that a
assurance is product or service with be
defined as satisfactory/adequate
I-15
,A Quality the framework necessary for
Assurance construction Quality Assurance
program serves implementation
as I-18
The making and agency and industry personnel
revision of QA (engineers, inspectors, technicians)
specs should I-19
include...
The 6 elements True
used in "design I-22
bid build" QA
programs are
the same as
"Design build"
construction QA
programs
Quality control Sampling, testing and visual
activities inspection
include... I-24
, -are Project Specific
- Address specific processes for
QC plans ... individual categories of work on a
construction process
I-25
Acceptance is the transportation agency
the I-26
responsibility of
...
the absolute threshold values for
Engineering
individual test results
limits are ...
I-29
Quality measures
QA specs use
I-28
identify discrepancies or
The purpose of differences in testing procedures
IA is to... or equipment
I-34
IA comparison split samples
is performed on I-34
...