Term 1 of 52
What system that uses chemical coagulation, chemical flocculation, or
electro-coagulation to reduce turbidity?
a. ATS
b. CGP
c. CWA
d. NAL
B D
A C
,Term 2 of 52
Hydrologic source controls are a design technique that minimize and/or
slow the rate of stormwater runoff from the site. Examples include:
a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility
Give this one a go later!
B D
C A
,Term 3 of 52
The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP)
__ hours prior to any likely precipitation event.
a. Immediately
b. 24 hours
c. 48 hours
d. ASAP but not more than 72 hours
Give this one a go later!
B D
C A
Term 4 of 52
TRUE OR FALSE: The SWPPP is a "living document" that is
amended/updated to reflect conditions & reduce pollutants
C False (LRP or LRP's Approved Signatory)
, True False
Term 5 of 52
Which statement is false? Monitoring is not required when:
a. the site/sampling locations are unsafe to access due to the storm event
b. it is outside of scheduled site operation hours
c. the contractor elects not to work and the site is "shut down" for a rainy
day
C D
A B
Don't know?
Term 6 of 52
The FOUR phases of construction include, all of the following EXCEPT:
a. Streets and Utility Phase
b. Vertical Construction Phase
c. Stormwater Sampling
What system that uses chemical coagulation, chemical flocculation, or
electro-coagulation to reduce turbidity?
a. ATS
b. CGP
c. CWA
d. NAL
B D
A C
,Term 2 of 52
Hydrologic source controls are a design technique that minimize and/or
slow the rate of stormwater runoff from the site. Examples include:
a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility
Give this one a go later!
B D
C A
,Term 3 of 52
The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP)
__ hours prior to any likely precipitation event.
a. Immediately
b. 24 hours
c. 48 hours
d. ASAP but not more than 72 hours
Give this one a go later!
B D
C A
Term 4 of 52
TRUE OR FALSE: The SWPPP is a "living document" that is
amended/updated to reflect conditions & reduce pollutants
C False (LRP or LRP's Approved Signatory)
, True False
Term 5 of 52
Which statement is false? Monitoring is not required when:
a. the site/sampling locations are unsafe to access due to the storm event
b. it is outside of scheduled site operation hours
c. the contractor elects not to work and the site is "shut down" for a rainy
day
C D
A B
Don't know?
Term 6 of 52
The FOUR phases of construction include, all of the following EXCEPT:
a. Streets and Utility Phase
b. Vertical Construction Phase
c. Stormwater Sampling