COSC 275 Final Exam Palmer 2025
Brand New
Estimating - -The process of determining the anticipated cost of materials, labor, and
equipment of a proposed project.
Take-off - -The process in which detailed lists are compiled, based on drawings and
specifications, of all the material and equipment necessary to construct a project. The
cost estimator uses this list to calculate how much it will cost to build the project.
Quantities - -Measured amounts of construction items expressed in their customary
units.
Quantification - -In estimating an activity to translate project scope information into
resource quantities suitable for
Quantity survey - -A detailed analysis of material and equipment required to construct a
project.
Area - -A measurement of a given planar region or of the surface of a solid.
Area method - -A construction cost estimating system employing unit square foot costs
multiplied by the adjusted gross floor area of a building.
Length - -The longest dimension of an object.
Linear measurement - -A unit or system of units for measuring length: 12" =
1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.
Dimension - -A distance between two points, lines, or planes.
Specifications - -Documents that define the qualitative requirements for products,
materials, and workmanship upon which the contract for construction is based.
Drawings - -Graphic illustrations depicting the dimensions, design, and location of a
project. Generally including plans, elevations, details, diagrams, schedules, and
sections.
Addendum - -A document describing an addition, change, correction, or modification to
contract documents. An addendum is issued by the design professional during the
bidding period or prior to the award of contract, and is the primary method of informing
bidders of modifications to the work during the bidding process. Addenda become part
of the contract documents.
COSC 275
, COSC 275
Amendment - -A modification of the contract by a subsequent agreement. This does not
change the entire existing contract but does alter the terms of the affected provisions or
requirements.
Grade - -The surface or level of the ground.
Level - -A term used to describe any horizontal surface that has all points at the same
elevation and thus does not tilt or slope.
Site - -The location of a project geographically, usually defined by legal boundaries.
Elevation - -A vertical distance relative to a reference point.
Cut and fill - -An operation commonly used in road building and other rock and earth-
moving operations in which the material excavated and removed from one location is
used as fill material at another location.
Fill - -The soil or other material used to raise the grade of a site area.
Foundation - -The entire masonry substructure below the first floor or frame of a
building, including the footing upon which the building rests.
Grade beam - -A horizontal end-supported (as opposed to ground-supported) load-
bearing foundation member that supports an exterior wall of a superstructure.
Width - -The measurement or extent of something from side to side.
Footing - -That portion of the foundation of a structure that spreads and transmits the
load directly to the soil.
Reinforced concrete - -Concrete containing adequate reinforcement, prestressed or not
prestressed, and designed on the assumption that the two materials (steel and
concrete) act together in resisting forces.
Reinforcing bar - -A steel bar, usually with manufactured deformations, used in concrete
and masonry construction to provide additional strength.
Footing beam - -A reinforced concrete beam connecting pile caps or spread footings to
distribute horizontal loads caused by eccentric loading.
Bolster - -In concrete, an individual or continuous support used to hold reinforcing bars
in position. Usually used in slab work.
Pan construction - -A type of concrete floor or roof in which pan forms are used to
create intersecting ribs and resulting in a waffle-like undersurface.
COSC 275