• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Appa Cefp Section 2 Questions And Answers

Document preview thumbnail
Preview 2 out of 15 pages

APPA CEFP SECTION 2 QUESTIONS AND ANSWERS Capital Renewal/Replacement - CORRECT ANSWER"A systematic management process of planning and budgeting for known future cyclical repair and replacement requirements that extend the life retain the usable condition of facilities and systems, not normally contained in the annual operating budget. Includes major activities that have a maintenance cycle in excess of one year (e.g., replace roofs, paint buildings, resurface roads)."

Content preview

APPA CEFP SECTION 2 QUESTIONS AND ANSWERS
Capital Renewal/Replacement - CORRECT ANSWER✅✅✅"A systematic management process of
planning and budgeting for known future cyclical repair and replacement requirements that extend the
life retain the usable condition of facilities and systems, not normally contained in the annual operating
budget. Includes major activities that have a maintenance cycle in excess of one year (e.g., replace roofs,
paint buildings, resurface roads)."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Facilities Condition Index (FCI Index) - CORRECT ANSWER✅✅✅'A comparative industry
indicator/benchmark used to indicate the relative physical condition of a facility, group of buildings, or
entire portfolio "independent " of building type, construction type, type location, or cost."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Deferred Maintenance (DM) Backlog - CORRECT ANSWER✅✅✅"Total dollar amount of existing
maintenance repairs and required replacements (capital renewal) that were not accomplished when
they should have been, not funded in the current fiscal year, or otherwise deferred."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Strategic Capital Development Model - CORRECT ANSWER✅✅✅"Instead of periodic and stand-alone
studies of elements of the capital needs of an institution, this model defines six phases of an integrated
and comprehensive (" soup-to Nuts") planning process."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Facilities Condition Assessment - CORRECT ANSWER✅✅✅"Continuous systematic approach to
identifying assessing, prioritizing, and maintaining the specific maintenance, repair, renewal, and
replacement requirements for all facility assets."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]

, Facilities Audit - CORRECT ANSWER✅✅✅"Method of assessing existing buildings and infrastructure
to measure the extent of maintenance backlogs."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Recapitalization - CORRECT ANSWER✅✅✅"Periodic recurring costs for replacement/renewal
projects and one-time funding for improvements and programmatic projects."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Trade Based/ Central Shop Organization - CORRECT ANSWER✅✅✅"The plumbers report to one
supervisor. the electricians to another, and the HVAC mechanics to another. The trade staff is then
dispatched to jobs in any facility from the central pool of resources."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Zone based Organization - CORRECT ANSWER✅✅✅"Assigns a mixture of trade expertise to care for
a specific set of buildings"



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Function Based Organization - CORRECT ANSWER✅✅✅"Structured around the type of work. One
work group performs the preventive maintenance, while another group responds to service calls."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]



Time and Material Agreement - CORRECT ANSWER✅✅✅"A customer is charged a predetermined
hourly rate for labor plus the cost of materials and equipment needed for a job."



[BOK - Operations and Maintenance, Plant Management, Capital Renewal and Deferred Maintenance]

Document information

Uploaded on
May 29, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES
3.4
(14)
Sold
98
Followers
2
Items
11990
Last sold
17 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions