UMO Check On Learning questions with
complete solutions
Who is responsible for obtaining rail cars for the deploying unit? - answer-The
c c c c c c c c c c c c
Installation Transportation Office - ITO
c c c c c
When railcars arrive on site, who is responsible for inspecting the railcars prior to
c c c c c c c c c c c c c
accepting the cars from the rail carrier? - answer-The ITO is responsible for the initial
c c c c c c c c c c c c c c c
inspection prior to accepting the railcars
c c c c c c
Who is responsible for providing the deploying unit with spanners for rail loading
c c c c c c c c c c c c
operations? - answer-The Installation Transportation Office - ITO
c c c c c c c c
What established rules govern all rail movements in CONUS? - answer-Association of
c c c c c c c c c c c
American Railways (AAR) rules
c c c c
What enhanced rail deployment capability does the Defense Freight Rail Interchange
c c c c c c c c c c
Fleet (DFRIF) provide? - answer-Pre-positioning of railcars at selected installations
c c c c c c c c c c
provides flexibility to quickly load military equipment for deployment operations.
c c c c c c c c c c
What type of railcar is ideal for transporting wheeled and tracked vehicles and oversized
c c c c c c c c c c c c c
equipment? - answer-Flat Cars
c c c c
What is the procedure used in the "circus loading" of unit equipment on railcars? -
c c c c c c c c c c c c c c
answer-The "circus loading" method uses flatcars as a roadbed with spanners between
c c c c c c c c c c c c
the railcars. Vehicles are loaded from the rear most railcar and then moved forward to
c c c c c c c c c c c c c c c
their assigned locations.
c c c
What is the minimum amount of space that must be maintained between vehicles that
c c c c c c c c c c c c c
are secured to the railcar deck? - answer-AAR rules require a minimum of 10 inches
c c c c c c c c c c c c c c c
between vehicles.
c c
What reference provides a checklist for loading and tying down unit equipment on
c c c c c c c c c c c c
railcars? - answer-SDDC TEA Pam 55-19, Tiedown Handbook for Rail Movements
c c c c c c c c c c c
What APOE area is used by the deploying unit to make final equipment preparations? -
c c c c c c c c c c c c c c
answer-Unit Marshaling Area
c c c
What APOE area is used for transferring control of unit aircraft loads to the DACG? -
c c c c c c c c c c c c c c c
answer-The Alert Holding Area
c c c c
, What APOE area is used for the joint inspection of deploying unit equipment? - answer-
c c c c c c c c c c c c c c
The Call Forward Area
c c c
What organization at the APOE ensures that aircraft passengers are properly briefed on
c c c c c c c c c c c c
aircraft safety and delivers the passengers to the aircraft? - answer-The CRE briefs
c c c c c c c c c c c c c
passengers and escorts them to the aircraft.
c c c c c c c
What are the qualification requirements for the UMO position? - answer-The UMO must
c c c c c c c c c c c c
be appointed in writing by the unit commander, be E-6 or above (E-5 for alternates), and
c c c c c c c c c c c c c c c c
be trained at an approved school.
c c c c c c
What references identify UMO responsibilities and duties? - answer-FORSCOM/ARNG
c c c c c c c c
REG 55-1, ATP 3-35 Appendix D, and AR 525-93 identify UMO responsibilities
c c c c c c c c c c c c
What are the two types of movement plans? - answer-Mobilization movement plans and
c c c c c c c c c c c c
deployment movement plans
c c c
What are the four elements of a unit that we must consider when developing a unit
c c c c c c c c c c c c c c c
deployment movement plan? - answer-Personnel, equipment, supplies and baggage.
c c c c c c c c c
What is the difference between YELLOW TAT and RED TAT? - answer-YELLOW TAT
c c c c c c c c c c c c
must accompany troops and be accessible en-route, while RED TAT must be available
c c c c c c c c c c c c c
at the destination before or upon unit arrival.
c c c c c c c c
Which Armed Force(s) use TC-AIMS II for deployment and sustainment? - answer-The
c c c c c c c c c c c
US Army and its Reserves, the US Navy and its Reserves, and the Army National
c c c c c c c c c c c c c c c
Guard
c
At what point is the information in TC-AIMS II considered secret? - answer-When the
c c c c c c c c c c c c c
information is passed in COMPASS and JOPES.
c c c c c c c
What are the four major Business Processes in
c c c c c c c c
TC AIMS II? - answer-The four major Business Processes are:
c c c c c c c c c c
1. Asset Management
c c c
2. Movement Planning
c c c
3. Movement Coordination
c c c
4. Movement Execution
c c
What are the four ways to add equipment in the OEL? - answer-1.Click 'Add' on the
c c c c c c c c c c c c c c c
bottom of the page
c c c c c
c 2. Click 'Edit' then 'Add' in the menu bar
c c c c c c c c c
complete solutions
Who is responsible for obtaining rail cars for the deploying unit? - answer-The
c c c c c c c c c c c c
Installation Transportation Office - ITO
c c c c c
When railcars arrive on site, who is responsible for inspecting the railcars prior to
c c c c c c c c c c c c c
accepting the cars from the rail carrier? - answer-The ITO is responsible for the initial
c c c c c c c c c c c c c c c
inspection prior to accepting the railcars
c c c c c c
Who is responsible for providing the deploying unit with spanners for rail loading
c c c c c c c c c c c c
operations? - answer-The Installation Transportation Office - ITO
c c c c c c c c
What established rules govern all rail movements in CONUS? - answer-Association of
c c c c c c c c c c c
American Railways (AAR) rules
c c c c
What enhanced rail deployment capability does the Defense Freight Rail Interchange
c c c c c c c c c c
Fleet (DFRIF) provide? - answer-Pre-positioning of railcars at selected installations
c c c c c c c c c c
provides flexibility to quickly load military equipment for deployment operations.
c c c c c c c c c c
What type of railcar is ideal for transporting wheeled and tracked vehicles and oversized
c c c c c c c c c c c c c
equipment? - answer-Flat Cars
c c c c
What is the procedure used in the "circus loading" of unit equipment on railcars? -
c c c c c c c c c c c c c c
answer-The "circus loading" method uses flatcars as a roadbed with spanners between
c c c c c c c c c c c c
the railcars. Vehicles are loaded from the rear most railcar and then moved forward to
c c c c c c c c c c c c c c c
their assigned locations.
c c c
What is the minimum amount of space that must be maintained between vehicles that
c c c c c c c c c c c c c
are secured to the railcar deck? - answer-AAR rules require a minimum of 10 inches
c c c c c c c c c c c c c c c
between vehicles.
c c
What reference provides a checklist for loading and tying down unit equipment on
c c c c c c c c c c c c
railcars? - answer-SDDC TEA Pam 55-19, Tiedown Handbook for Rail Movements
c c c c c c c c c c c
What APOE area is used by the deploying unit to make final equipment preparations? -
c c c c c c c c c c c c c c
answer-Unit Marshaling Area
c c c
What APOE area is used for transferring control of unit aircraft loads to the DACG? -
c c c c c c c c c c c c c c c
answer-The Alert Holding Area
c c c c
, What APOE area is used for the joint inspection of deploying unit equipment? - answer-
c c c c c c c c c c c c c c
The Call Forward Area
c c c
What organization at the APOE ensures that aircraft passengers are properly briefed on
c c c c c c c c c c c c
aircraft safety and delivers the passengers to the aircraft? - answer-The CRE briefs
c c c c c c c c c c c c c
passengers and escorts them to the aircraft.
c c c c c c c
What are the qualification requirements for the UMO position? - answer-The UMO must
c c c c c c c c c c c c
be appointed in writing by the unit commander, be E-6 or above (E-5 for alternates), and
c c c c c c c c c c c c c c c c
be trained at an approved school.
c c c c c c
What references identify UMO responsibilities and duties? - answer-FORSCOM/ARNG
c c c c c c c c
REG 55-1, ATP 3-35 Appendix D, and AR 525-93 identify UMO responsibilities
c c c c c c c c c c c c
What are the two types of movement plans? - answer-Mobilization movement plans and
c c c c c c c c c c c c
deployment movement plans
c c c
What are the four elements of a unit that we must consider when developing a unit
c c c c c c c c c c c c c c c
deployment movement plan? - answer-Personnel, equipment, supplies and baggage.
c c c c c c c c c
What is the difference between YELLOW TAT and RED TAT? - answer-YELLOW TAT
c c c c c c c c c c c c
must accompany troops and be accessible en-route, while RED TAT must be available
c c c c c c c c c c c c c
at the destination before or upon unit arrival.
c c c c c c c c
Which Armed Force(s) use TC-AIMS II for deployment and sustainment? - answer-The
c c c c c c c c c c c
US Army and its Reserves, the US Navy and its Reserves, and the Army National
c c c c c c c c c c c c c c c
Guard
c
At what point is the information in TC-AIMS II considered secret? - answer-When the
c c c c c c c c c c c c c
information is passed in COMPASS and JOPES.
c c c c c c c
What are the four major Business Processes in
c c c c c c c c
TC AIMS II? - answer-The four major Business Processes are:
c c c c c c c c c c
1. Asset Management
c c c
2. Movement Planning
c c c
3. Movement Coordination
c c c
4. Movement Execution
c c
What are the four ways to add equipment in the OEL? - answer-1.Click 'Add' on the
c c c c c c c c c c c c c c c
bottom of the page
c c c c c
c 2. Click 'Edit' then 'Add' in the menu bar
c c c c c c c c c