CM 4211 REVISION EXAM TEST 2025/2026 QUESTIONS
WITH ANSWERS TAGGED A+
✔✔Which one of the following statements is false?

- A cost plus percentage fee contract is one where the contractor is reimbursed for his
cost plus a fee that is a percentage of those cost
- A cost plus fixed fee contract is one where the contractor receives the same fee no
matter how high or low the cost
- A target estimate contract is one where the contractor has no incentive to hold down
cost
- A GMP contract is one where the total payment to the contractor of cost and fees is
capped, no matter how high the cost run
- A contractor can make more profit with a fixed price contract than with cost plus
contracts - ✔✔- A target estimate contract is one where the contractor has no incentive
to hold down cost

✔✔Which one of the following statements is false?
- A "fast-track" project is always a contract-only contract
- A "fast-track" project is one in which the construction of one phase is started before
design of another phase is completed
- A drawback to "fast-tracking" a project is the risk that after construction is already
place a problem may develop with subsequent design that requires changing the work
already done
- A "turnkey" contract is always a design construct contract
- A "turnkey" contract is one where the contractor performs virtually every task required
produce a finished, functioning facility - ✔✔- "fast-track" project is always a contract-only
contract

✔✔Which one of the following is not one of the typical documents comprising the
contract documents?
- Bidding documents
- Plans
- Specs
- Subcontracts
- General Conditions - ✔✔- Subcontracts

✔✔An advertisement for a bid should always include four items of information. Which
one of the following does not have to included? - ✔✔- What subcontractors to use

✔✔Which one of the following statements is not true regarding the bid form?
- It is drafted by the Owner
- It is completed by the Contractor
- It may require the Contractor to provide financial information
- It is the offer by the Contractor

, - All of the above are true - ✔✔- All of the above are true

✔✔Which one of the following is not usually found in a Physical Conditions Report?
- Physical conditions of materials to be used
- Subsurface conditions
- Soil conditions
- Weather records
- Hydrographs if a river or stream is nearby - ✔✔- Physical conditions of materials to be
used

✔✔The five threshold red flag prime contract clauses include: - ✔✔- Changes in the
work, differing site conditions, delays of work, dispute resolution, and terminations of
work

✔✔Which one of the following is not a default caused by the contractor that permits the
owner to terminate the contract for clause?
- Contractor becomes insolvent
- Contractor uses a subcontractor that the owner does not like
- Contractor's work fails to meet reasonable quality requirements
- Contractor falls far behind a reasonable time schedule
- None of the above - ✔✔- Contractor uses a subcontractor that the owner does not like

✔✔Liquidated damages are:
- the damages suffered by the owner for faulty workmanship by the contractor
- An agreement between the owner and the contractor after completion of the project as
to actual damages for late completion of the contract
- An agreement between the owner and the contractor as to the per diem amount owed
by the owner to the contractor for early completion of the contract
- None of the above
- Both B & C - ✔✔- None of the above

✔✔NTP stands for: - ✔✔- Notice To Proceed

✔✔Retainage (retention) is the amount the owner keeps from the contractor's progress
payments to pay for: - ✔✔- Remedial work

✔✔A variation in quantities clause is designed to:
- Vary the quantities in a lump sum contract
- Vary the quantities in a unit price contract
- Vary the quantities in a cost plus contract
- Both A & B
- None of the above - ✔✔- None of the above

Document information

Uploaded on
May 27, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.5
(41)
Sold
291
Followers
11
Items
36202
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions