A quick and accurate means to estimate dimensions of a commercial space during a site
inspection would be to _____? - CORRECT ANSWER - Count the number of ceiling tiles
in a drop tile installation
A client requires a new boardroom. The sales person and engineer are sent to the premises to
survey the facility and discuss the opportunity with the client. This process is best described as a
____ - CORRECT ANSWER - Needs Analysis
When designing a client's new training room, the MOST important information would come
from the - CORRECT ANSWER - end-user descriptions of how the room will be utilized
When establishing initial contact with a client, try to develop a relationship early on with the: -
CORRECT ANSWER - Stakeholders
When creating an AV solution for a client, the first step should be - CORRECT
ANSWER - Gathering application requirements
AV professionals determine the end user's needs by examining three things: the required
applications, the tasks, and the: - CORRECT ANSWER - Functions to support the
applications
What is the BEST way to determine how reverberant a space is? - CORRECT ANSWER -
Use an RT60 meter
__ is the process of examining methods, techniques, and principles from peer organizations and
facilities. - CORRECT ANSWER - Benchmarking
, When working with a client what should be AVOIDED to ensure that you are communicating
effectively? - CORRECT ANSWER - Industry slang terms and jargon
Prior to conducting a needs analysis for a new project, a coworker tells the AV designer what
equipment package they know will work. What should the designer do with this information? -
CORRECT ANSWER - Thank the coworker for their input, remind them that you still
need to conduct a needs analysis.
The correct time to discuss visible finishes for wall plates, surface mount speakers, and wall
mounted screen casings is during the: - CORRECT ANSWER - Site survey
A client requires a front projection system. What drawings should be requested from the client to
select the appropriate lens? - CORRECT ANSWER - reflected ceiling plans and elevations
When surveying a room before the start of the job, which of the following is NOT important? -
CORRECT ANSWER - The color of the conference room walls
The main purpose of an initial site survey is to: - CORRECT ANSWER - Verify
assumptions, and identify any challenges with the installation of the audio visual systems
When conducting a site survey at an active construction site what should you confirm FIRST
before arriving onsite? - CORRECT ANSWER - Required PPE to be onsite.
The top view drawing is also know as a___ - CORRECT ANSWER - Plan view
What is NOT an example of typical safety equipment you'd have readily available for a site visit?
- CORRECT ANSWER - Tools with nonslip handles
After a site visit you realize you forgot to measure the room length. You did measure the width
as 35 feet and ceiling height as 8 feet. Knowing from other documentation that the room's total
area is 980 square feet, what might the length be? - CORRECT ANSWER - 28 ft