A project was authorized as an operational necessity to repair a design flaw i
V V V V V V V V V V V V V
n the date field on a computer system that constrains the year number to two
V V V V V V V V V V V V V V
digits instead of permitting the year to be indicated with four digits. During
V V V V V V V V V V V V V V
execution of the activity concerned with identifying the affected software, fiv
V V V V V V V V V V
e relevant software modules were discovered that had not been included in t
V V V V V V V V V V V V
he scope baseline. The project team must adjust the baselines to include the
V V V V V V V V V V V V V
omitted scope. V
Which change management phase does this scenario describe?
V V V V V V V
,2|Page
a) Preparing for the change
V V V V
b) Managing the change
V V V
c) Reinforcing the change
V V V
d) Upgrading the change - answera) Preparing for the change
V V V V V V V V V
A general contractor is managing a highway construction project that will re
V V V V V V V V V V V
pair a flood-V V
damaged road. The Department of Transportation offered an incentive fee if
V V V V V V V V V V V
the repairs are completed early. Therefore, the project manager has establish
V V V V V V V V V V
ed a rewards and recognition program and has communicated this program t
V V V V V V V V V V V
o the project team member. The project's recognition program will reward pr
V V V V V V V V V V V
oject team members who add value by accelerating the project while maintai
V V V V V V V V V V V
ning its ability to deliver the completed scope correctly.
V V V V V V V V
Which change management phase does this scenario describe?
V V V V V V V
a) Preparing for the change
V V V V
b) Managing the change
V V V
c) Reinforcing the change
V V V
d) Upgrading the change - answerc) Reinforcing the change
V V V V V V V V
,3|Page
A general contractor is managing a construction project that will add a new c
V V V V V V V V V V V V V
onference room to an existing office building. The project was documented i
V V V V V V V V V V V
n a fixed-
V V
price contract that specified a completion date. The contract includes a dama
V V V V V V V V V V V
ges clause imposing a late completion penalty if the conference room is not r
V V V V V V V V V V V V V
eady for use by the due date. One month into the implementation, the custo
V V V V V V V V V V V V V
mer wants to modify the room's lighting equipment. The requested change w
V V V V V V V V V V V
ill delay the project's critical path by three months.
V V V V V V V V V
Which process should be used to maintain the existing baseline?
V V V V V V V V V
a) Using a change management system to influence performance
V V V V V V V V
b) Absorbing the change request in the baselines for time and cost
V V V V V V V V V V V
c) Focusing on the original scope
V V V V V
d) Using the risk management system to process change requests -
V V V V V V V V V V
answera) Using a change management system to influence performance
V V V V V V V V V
A general contractor from Germany is managing a construction project in No
V V V V V V V V V V V
rway that will add a new conference room to an existing office building. The
V V V V V V V V V V V V V V
project needs to collect requirements from the client prior to developing plan
V V V V V V V V V V V
s to build the new conference room.
V V V V V V
, 4|Page
Which two actions would prove useful to plan the project's quality?
V V V V V V V V V V
a) Defining traceable and verifiable requirements that can be validated at pro
V V V V V V V V V V V
ject closureV
b) Establishing metrics that describe what to measure and how to mea
V V V V V V V V V V V
sure it V
c) Using inventory to protect against defects during project implementation
V V V V V V V V V
d) Changing the work plan to account for the project experiencing common v
V V V V V V V V V V V V
ariation
e) Using slogans and numerical quotas to exhort resources to work harder -
V V V V V V V V V V V V
answera & b
V V V
a) Defining traceable and verifiable requirements that can be validated at pro
V V V V V V V V V V V
ject closureV
b) Establishing metrics that describe what to measure and how to measure it
V V V V V V V V V V V V
What is the name for the closing task where all project activities are reviewed
V V V V V V V V V V V V V
to determine what went right and what went wrong?
V V V V V V V V V
a) Closeout review
V V