DQA SMQT TEST FINAL EXAM 2025
ACTUAL EXAM COMPLETE EXAM
QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100%
CORRECT ANSWERS) /ALREADY
GRADED A+
Save
Terms in this set (150)
, Noncompliance that has potential to
cause more than minimal harm that
is not IJ
resident has no more than minimal
discomfort,
their is a potential to compromise
What is severity
residents ability to reach highest
level 2
practicable level,
shame/embarassment without loss
of interest
minimal episodic pain,
facility has no system to prevent
problems
Create/export shell from ACO
Import shell into ASE-q
The TC must Add team members
complete which Complete offsite prep screen
tasks during Make unit assignments
offsite prep? Make mandatory task assignments
print documents
Share offsite prep with team
, What documents 1 matrix with instructions
are printed by 1 entrance conference worksheet
the TC during 3 beneficiary worksheets
offsite prep?
What is the To briefly screen all residents and
purpose of the observe, interview and complete
initial pool initial record review.
process?
When should At the end of each day and when
you share data? the team composition changes.
What must be The completed I.P data is shared
done prior to and the TC confirms that the data is
Sample complete.
Selection
1. Offsite prep
2. Facility entrance
3. Initial Pool Process
What are the 7 4. Sample Selction
LTSCP steps? 5.Investigation
6. Ongoing and other survey
activities
7. Potential Citations
ACTUAL EXAM COMPLETE EXAM
QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100%
CORRECT ANSWERS) /ALREADY
GRADED A+
Save
Terms in this set (150)
, Noncompliance that has potential to
cause more than minimal harm that
is not IJ
resident has no more than minimal
discomfort,
their is a potential to compromise
What is severity
residents ability to reach highest
level 2
practicable level,
shame/embarassment without loss
of interest
minimal episodic pain,
facility has no system to prevent
problems
Create/export shell from ACO
Import shell into ASE-q
The TC must Add team members
complete which Complete offsite prep screen
tasks during Make unit assignments
offsite prep? Make mandatory task assignments
print documents
Share offsite prep with team
, What documents 1 matrix with instructions
are printed by 1 entrance conference worksheet
the TC during 3 beneficiary worksheets
offsite prep?
What is the To briefly screen all residents and
purpose of the observe, interview and complete
initial pool initial record review.
process?
When should At the end of each day and when
you share data? the team composition changes.
What must be The completed I.P data is shared
done prior to and the TC confirms that the data is
Sample complete.
Selection
1. Offsite prep
2. Facility entrance
3. Initial Pool Process
What are the 7 4. Sample Selction
LTSCP steps? 5.Investigation
6. Ongoing and other survey
activities
7. Potential Citations