Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Mobile Crane Questions Test #7 Questions With Complete Solutions

Document preview thumbnail
Preview 2 out of 7 pages

Mobile Crane Questions Test #7 Questions With Complete Solutions

Content preview

Mobile Crane Questions Test #7 Questions
With Complete Solutions

According to OSHA 1926.251, how much length
must there be between splices or end fittings on
regular lay cable slings. Correct Answers 10x's
the rope diameter

According to OSHA subpart cc when must you take
regular lay running rope out of service? Correct
Answers 2 broken wires in six diameters & 3
broken wires in one strand in one lay.

According to OSHA, which of the following is not
required for monthly crane inspections? Correct
Answers Checking the fluid in the differential.

All spreader bars and equalizer beams should be
tested to what ____________% of their rated
capacity? Correct Answers 125%.

An operator must obey a stop signal from: Correct
Answers From anyone.

Effective weight of stowed extension or jib: Correct
Answers Lower than the actual weight of the jib or
extension.

Figure the weight of a concrete block 6 inches thick
5 feet wide and 10 feet long.....Concrete weighs

, 150 lbs. per square foot. Correct Answers 3,750
lbs.

For a foot pedal in a conventional crane what is the
maximum amount of force you should have to
apply before it applies the latching mechanism?
Correct Answers 50 lbs.

Gross load is? Correct Answers The sum of
weights, attachments and rigging.

How close can you get to a 250 kv powerline
without a spotter? Correct Answers 20 ft.

How far shall the drum flange extend over the top
layer of rope Correct Answers Minimum of a ½
inch.

How long does your employer have to retain
monthly inspection documentation? Correct
Answers Three months.

How many days after a category 1 operational aid
is reported not working does the employer have to
fix the deficiency? Correct Answers 7 days.

If a jib is erected but not being used, it is treated as
a deduction from the cranes: Correct Answers
Gross capacity.

Document information

Uploaded on
May 18, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom
4.0
(1202)
Sold
4961
Followers
3240
Items
56146
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions