An operator has been asked to pick and carry a
load down a small section of the public highway,
for which The Road Traffic Act applies. Wwhat
effect does this have on crane operations? Correct
Answers The crane must meet all the
requirements for the being road legal , the
operator must have the appropriate driving licence
and the operation can only be done for a maximum
distance of 1000yards
Apart from the operator, who else may need to use
the machine's Operator's Manual? Correct Answers
Maintenance Staff , Supervisors and Transporter
Drivers
As a lifting machine, the crane must be thoroughly
examined. What is the purpose of the examination
and who would carry out the examination? Correct
Answers To ensure the crane is free from
structural defects and problems not covered by the
daily checks . AN AUTHORISED AND COMPETENT
PERSON
As the crane rotates through 360 degrees with a
load, what happens to the loading on each
outrigger or wheel? Correct Answers The Loading
will rise and fall accordingly
, Before leaving the cab for a rest break, after
parking and switching off the machine, what final
action must be carried out? Correct Answers
Machine must be isolated ,Windows Closed, doors
closed and Locked
Crane operations fall within the scope of the Lifting
Operations and Lifting Equipment Regulations
(LOLER) 1998. Name TWO requirements of the
regulations with regards to lifting. Correct Answers
Any lifting operations must be , Properly planned ,
Properly Supervised
During the lifting operation, part of the task cannot
be carried out as detailed in the lift plan. What
initially must happen to the lifting operation and
who authorises any changes? Correct Answers
The Operation must stop until the plan is
amended . The appointed Person
During work, the engine starts to overheat. Explain
the danger if someone tries to remove the radiator
or expansion tank cap. Correct Answers Removing
the radiator tank cap Will cause the hot liquid
inside to be released under pressure and could
cause burns
Give FOUR reasons that may cause the crane to
overturn. Correct Answers Excessive load swing ,
Complete Solutions
An operator has been asked to pick and carry a
load down a small section of the public highway,
for which The Road Traffic Act applies. Wwhat
effect does this have on crane operations? Correct
Answers The crane must meet all the
requirements for the being road legal , the
operator must have the appropriate driving licence
and the operation can only be done for a maximum
distance of 1000yards
Apart from the operator, who else may need to use
the machine's Operator's Manual? Correct Answers
Maintenance Staff , Supervisors and Transporter
Drivers
As a lifting machine, the crane must be thoroughly
examined. What is the purpose of the examination
and who would carry out the examination? Correct
Answers To ensure the crane is free from
structural defects and problems not covered by the
daily checks . AN AUTHORISED AND COMPETENT
PERSON
As the crane rotates through 360 degrees with a
load, what happens to the loading on each
outrigger or wheel? Correct Answers The Loading
will rise and fall accordingly
, Before leaving the cab for a rest break, after
parking and switching off the machine, what final
action must be carried out? Correct Answers
Machine must be isolated ,Windows Closed, doors
closed and Locked
Crane operations fall within the scope of the Lifting
Operations and Lifting Equipment Regulations
(LOLER) 1998. Name TWO requirements of the
regulations with regards to lifting. Correct Answers
Any lifting operations must be , Properly planned ,
Properly Supervised
During the lifting operation, part of the task cannot
be carried out as detailed in the lift plan. What
initially must happen to the lifting operation and
who authorises any changes? Correct Answers
The Operation must stop until the plan is
amended . The appointed Person
During work, the engine starts to overheat. Explain
the danger if someone tries to remove the radiator
or expansion tank cap. Correct Answers Removing
the radiator tank cap Will cause the hot liquid
inside to be released under pressure and could
cause burns
Give FOUR reasons that may cause the crane to
overturn. Correct Answers Excessive load swing ,