1. If rotation-resistant rope is used, the slings must be capable of
supporting, without failure, at least - correct answer -Ten times
the maximum intended load
2. When hoisting personnel near power lines, the need for power
line shutdown is not negated by - correct answer -Operator
aids
3. According to ASME, periodic inspections of platforms are to be
conducted at least once every - correct answer -12 months
4. Even if power lines have been shut down, what must be
installed at the operator's station and on the outside of the
crane? - correct answer -Signs warning of electrocution or
bodily injury
, Page | 2
5. Hooks on headache ball assemblies, lower load blocks, or
other attachment assemblies must be - correct answer -Closed
and locked
6. Wire rope, shackles, rings, master links, and other rigging
hardware must be capable of supporting the maximum
intended load applied or transmitted to the component by at
least - correct answer -5 times
7. If travel is done with a rubber-tired carrier, the chart capacity for
personnel lifts on rubber must be used for application of the
reduction of rated capacity by - correct answer -50%
8. If deficiencies are found and corrected on a platform after a
proof test has been conducted, - correct answer -Another proof
test need to be conducted
9. Under ASME guidelines, the inspection paperwork for the last
inspection performed on a platform is to be kept - correct
answer -With the platform
, Page | 3
10. A multi-leg wire rope sling is known as a(n) - correct answer
-Bridle sling
11. Which of these is a fastening or coupling device? - correct
answer -Shackle
12. A full-body harness lanyard must have a maximum length
that allows a fall of no greater than - correct answer -6 feet
13. A live boom is a boom in which - correct answer -Lowering is
controlled by a brake without aid from other devices that slow
the lowering speed
14. All full-body harnesses and lanyard hardware, except rivets,
must be capable of withstanding a tensile loading of - correct
answer -4,000 lbs.
15. If a personnel platform includes a perforated steel enclosure,
the perforations must be no greater than - correct answer -1/2
inch
ADVANCED RIGGING 2025 BRAND NEW
ACTUAL EXAM WITH ANSWERS.
1. If rotation-resistant rope is used, the slings must be capable of
supporting, without failure, at least - correct answer -Ten times
the maximum intended load
2. When hoisting personnel near power lines, the need for power
line shutdown is not negated by - correct answer -Operator
aids
3. According to ASME, periodic inspections of platforms are to be
conducted at least once every - correct answer -12 months
4. Even if power lines have been shut down, what must be
installed at the operator's station and on the outside of the
crane? - correct answer -Signs warning of electrocution or
bodily injury
, Page | 2
5. Hooks on headache ball assemblies, lower load blocks, or
other attachment assemblies must be - correct answer -Closed
and locked
6. Wire rope, shackles, rings, master links, and other rigging
hardware must be capable of supporting the maximum
intended load applied or transmitted to the component by at
least - correct answer -5 times
7. If travel is done with a rubber-tired carrier, the chart capacity for
personnel lifts on rubber must be used for application of the
reduction of rated capacity by - correct answer -50%
8. If deficiencies are found and corrected on a platform after a
proof test has been conducted, - correct answer -Another proof
test need to be conducted
9. Under ASME guidelines, the inspection paperwork for the last
inspection performed on a platform is to be kept - correct
answer -With the platform
, Page | 3
10. A multi-leg wire rope sling is known as a(n) - correct answer
-Bridle sling
11. Which of these is a fastening or coupling device? - correct
answer -Shackle
12. A full-body harness lanyard must have a maximum length
that allows a fall of no greater than - correct answer -6 feet
13. A live boom is a boom in which - correct answer -Lowering is
controlled by a brake without aid from other devices that slow
the lowering speed
14. All full-body harnesses and lanyard hardware, except rivets,
must be capable of withstanding a tensile loading of - correct
answer -4,000 lbs.
15. If a personnel platform includes a perforated steel enclosure,
the perforations must be no greater than - correct answer -1/2
inch