• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Florida Gc Exam - Project Management Section Questions And Verified Answers

Document preview thumbnail
Preview 2 out of 9 pages

FLORIDA GC EXAM - PROJECT MANAGEMENT SECTION QUESTIONS AND VERIFIED ANSWERS The calculated fire-resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete wall shall be _______ hour(s). (Florida Building Code -- Calculated Fire Resistance) ans2 hours

Content preview

FLORIDA GC EXAM - PROJECT
MANAGEMENT SECTION QUESTIONS
AND VERIFIED ANSWERS
The calculated fire-resistance rating for a 3.8 inch thick sand and light weight aggregate precast concrete
wall shall be _______ hour(s).

(Florida Building Code --> Calculated Fire Resistance) ✔ans2 hours

Welded splices are almost always necessary in_______.

(Reinforcing Bars --> Welding) ✔ansPrecast Concrete Construction

Well-blasted rock has a swell percentage of:

(Principles and Practices of Commercial Construction --> Earthwork) ✔ans20%

Lifelines in areas subjected to cutting or abrasion shall be a minimum of ______ inch wire core manila
rope

(OSHA) ✔ans7/8

All excavations made in Type B soil 20 feet or less in depth which have vertically sided lower portions
shall be shielded or supported to a height _____ inches above the top of the vertical side

(OSHA) ✔ansAt least 18 inches

6. The OSHA area office has a maximum of ____ days to assess the penalty for failure to abate a
violation.

(Florida Contractors Manual --> Categories of Violations) ✔ans30 Days

7. High-density R-30 batts used in cathedral ceilings are_____ inches thick.

(Energy Efficient Building Construction --> Cathedral Ceilings) ✔ans8 - 1/4

8. According to ASTM C94, when truck mixers are used the load must be completely discharged
within______ after batching.

(Design and Control of Concrete Mixtures --> Mixing Concrete) ✔ans90 Minutes

9. Floor landings in stairways shall be installed at intervals not to exceed_______.

(Florida Building Code --> Stairway Construction, Landings) ✔ans12' Vertically

10. The thickness of concrete floor slabs supported directly on the ground shall not be less than____
inches.

(Florida Building Code --> Concrete, Slab, Minimum) ✔ans3 - 1/2

, 11. In _______ , the tendons are raised higher above the forms in the vicinity of the supporting column
than at the midspan of the slab.

(Principles and Practices of Commercial Construction --> Tendon, Post Tensioning) ✔ansPost-tensioned
Concrete Slabs

12. The maximum permissible slope for access aisles serving accessible parking spaces shall not be
greater than_______.

(Accessibility) ✔ans1:48

13. Excavations located five feet or less from the lot line during the renovation of an existing building,
shall be enclosed with a barrier not less than____ feet high.

(Florida Building Code --> Barriers, Protection) ✔ans6'

14. The preliminary site investigation is usually done _______.

(Principles and Practices of Commercial Construction --> Preliminary Investigation) ✔ansIn two stages

15. Where permitted, spiral stairways shall be constructed in such a way that the risers shall be
sufficient to provide a headroom of _____ minimum.

(Florida Building Code --> Spiral Stairs, Construction) ✔ans6' - 6"

16. Whenever materials are dropped________ to any point outside the exterior walls of the building, an
enclosed chute shall be used.

(OSHA --> Chutes) ✔ansMore than 20'

17. Automatic sprinkler systems in residential structures up to and including four stories in height shall
be permitted to be installed in accordance with ______.

(Florida Building Code --> Automatic Sprinkler Systems) ✔ansNFPA 13-47R

18. Masonry cements consist of portland cement together with other materials to enhance all of the
following except ______.

(Design and Control of Concrete Mixtures --> Masonry Cement) ✔ansAir-Entrainment

19. In steel frame construction, cross-bracing loads are typically_______.

(Principles and Practices of Commercial Construction --> Cross Bracing, Structural Steel) ✔ansIn Tension

20. Barricades for protection of employees shall conform to_______.

(OSHA --> Barricades) ✔ansThe Manual on Uniform Traffic Control Devices

21. The minimum dimensions for a crawl space access opening in a building shall be not less than _____
inches.

(Florida Building Code --> Crawl Space, Access) ✔ans18" x 24"

Document information

Uploaded on
May 12, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
39
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions