• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

Epa Lead Supervisor Test Bank With 100% Correct Answers 2024/2025

Document preview thumbnail
Preview 3 out of 18 pages

How does a lead hazard screen act as a "negative" screen? - Answer: if the results of the screen indicate that lead hazards are not present, no further testing is required What recommendation is made if more than 5 surfaces have paint in poor condition - Answer: a fill risk assessment is recommended Interim Controls - Answer: measures designed to temporarily reduce human exposure or possible exposure to LBP hazards. Interim control measures include - Answer: paint film stabilization; friction and impact reduction treatments; dust removal; soil covering using non-permanent means Abatement - Answer: measure or measures designed to permanently eliminate LBP hazards Abate measures include - Answer: building component replacement; enclosure; paint removal by heat gun, chemical, or contained abrasive; encapsulation (20 yr warranty), permanent soil covering; soil removal and replacement Three stages of the risk assessment at which counseling and education of owners and occupants are appropriate - Answer: 1. prior to the risk assessment 2. after the risk assessment but before implementation of any hazard control measures 3. after the implementation of hazard control measures Four functions of final risk assessment report - Answer: 1. summarize results by indicating where hazards are found 2. indicates range of hazard control options likely to be effective 3. includes all raw data and identifying information 4. in some jurisdictions becomes a legal document Deteriorated paint - Answer: any interior or exterior paint that is peeling, chipping, chalking, or cracking, or is located on an interior or exterior surface or fixture that is damaged or deteriorated Friction Surface - Answer: An interior or exterior surfaces that is subject to abrasion or friction (e.g., certain window, floor, and stair surfaces)

Content preview

EPA LEAD SUPERVISOR TEST BANK WITH 100%
CORRECT ANSWERS 2024/2025

✅How does a lead hazard screen act as a "negative" screen? - Answer: if the results
of the screen indicate that lead hazards are not present, no further testing is required

✅What recommendation is made if more than 5 surfaces have paint in poor condition -
Answer: a fill risk assessment is recommended

✅Interim Controls - Answer: measures designed to temporarily reduce human
exposure or possible exposure to LBP hazards.

✅Interim control measures include - Answer: paint film stabilization; friction and impact
reduction treatments; dust removal; soil covering using non-permanent means

✅Abatement - Answer: measure or measures designed to permanently eliminate LBP
hazards

✅Abate measures include - Answer: building component replacement; enclosure; paint
removal by heat gun, chemical, or contained abrasive; encapsulation (20 yr warranty),
permanent soil covering; soil removal and replacement

✅Three stages of the risk assessment at which counseling and education of owners
and occupants are appropriate - Answer: 1. prior to the risk assessment
2. after the risk assessment but before implementation of any hazard control measures
3. after the implementation of hazard control measures

✅Four functions of final risk assessment report - Answer: 1. summarize results by
indicating where hazards are found
2. indicates range of hazard control options likely to be effective
3. includes all raw data and identifying information
4. in some jurisdictions becomes a legal document

✅Deteriorated paint - Answer: any interior or exterior paint that is peeling, chipping,
chalking, or cracking, or is located on an interior or exterior surface or fixture that is
damaged or deteriorated

✅Friction Surface - Answer: An interior or exterior surfaces that is subject to abrasion
or friction (e.g., certain window, floor, and stair surfaces)

,✅Impact surface - Answer: an interior or exterior surface that is subject to damage
from repeated impacts (parts of door frames)

✅Interim controls - Answer: measures designed to temporarily reduce human
exposure or possible exposure to LBP hazards.

✅Allowable lead quantity in water - Answer: 15 ppb/liter, or 15 mgL

✅Lead blood level of concern for children - Answer: 5 ug/dL

✅NIOSH Lead blood level of concern - Answer: 25 ug/dL

✅OSHA employee lead blood level of concern - Answer: 40 ug/dL

✅OSHA medical removal lead blood level - Answer: 50 ug/d?

✅T/F It is wise for inspectors to be trained in respiratory protection standards but it is
not mandatory for EPA lead inspectors - Answer: True

✅What should an assessor wear at a minimum to perform inspection/risk assessment
of a pre 1978 home? - Answer: booties and rubber gloves

✅Y/N An abatement project has been scheduled in a 1950's house. Is a risk
assessment required by Title X law before work begins - Answer: No

✅T/F The standard procedure for taking a dust sample must include these steps:
layout the sample area; measure 1/10 to 1 square foot; prepare the tube; place gloves
on; properly wipe the sample area in a "S" motion with an approved wipe; place folded
wipe in a sampling tube; clean up sampling materials. - Answer: True

✅Why are dust samples taken? - Answer: to identify lead paint hazards; to see if the
contractor cleaned up properly after renovation; to identify a dust hazard from lead that
may not be paint

✅After a final clearance wipe down, a clearance test can begin _________ after the
clean-up. - Answer: one hour

✅T/F No one should operate the XRF analyzer until they have received radiation
safety training - Answer: True

✅What does a performance characteristic sheet for an XRF instrument determine? -
Answer: XRF specified range; results that are positive, negative, and inconclusive;
calibration check tolerances

, ✅A testing combination is a - Answer: unique combination of room equivalents,
building component types, or substrates

✅Lead Paint 1978 level allowed - Answer: .06%; 600 ppm

✅Current level lead allowed in paint - Answer: .009%; 90 ppm

✅Lead Paint allowed in all other consumer products - Answer: .01%; 100 ppm

✅Hazardous Waste Toxic Characteristic Leaching Procedure (TCLP) - Answer: 5 ppm

✅The use of lead based paint exceeding .06% was banned - Answer: in 1978 for
residential housing.

✅T/F the concentration of lead paint in deteriorating housing must be greater than 1
mg/cm2 by XRF to pose a threat to workers doing renovation or abatement practices. -
Answer: False

✅Title X does not apply to; - Answer: bridges and steel structure; hotels and motels
rented less than 100 days and commercial complexes.

✅What is the primary objective of a Lead Paint Risk Assessment? - Answer: to
discover lead hazards

✅What is the primary objective of a Lead Paint Inspection? - Answer: to discover lead
paint

✅TSCA Title IV, Section 402/404 Rule directed EPA to; - Answer: develop training and
certification requirements for lead professionals. Individuals performing inspections and
risk assessments for lead hazards must be certified through the EPA accredited
program

✅T/F EPA's debris rule advises contractors that lead waste generated during
renovation and remodeling of residential housing is now waived from RCRA's rule and
can be disposed of as municipal waste - Answer: True

✅T/F OSHA established the standard for the worker's permissible exposure limit,
action limit, and exposure time while abating lead - Answer: True

✅T/F Section 1012/1013 within Title X are sections referring to HUD rules - Answer:
True

✅Y/N Are lead inspections mandatory in pre 1978 housing? - Answer: No

Document information

Uploaded on
May 9, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
184
Followers
2
Items
58897
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions