Technician CP-19 (14) 2025/2026 Exam
Questions and Correct Answers | New
Update
These procedures for capping enable concrete cylinders and cores to meet
the standard's requirements for ________ and _________. - 🧠 ANSWER
✔✔Planeness, perpendicularity
Equipment needed for the capping process includes capping _____ ,
_____devices, and ______ pots. - 🧠 ANSWER ✔✔Plates, alignment,
melting
Plates for neat cement and high strength gypsum plaster caps should be
made of _____, _____, _____ or _____. - 🧠 ANSWER ✔✔Glass, metal
granite or diabase
Sulfur mortar cap plates should be formed against _____ or _____ plates. -
🧠 ANSWER ✔✔Metal, Stone
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
1
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, The purpose of the guide bar or bull's eye level is to ensure that caps
remain perpendicular to the axis of the cylinder within 0.5 degrees. True or
False? - 🧠 ANSWER ✔✔True
To avoid accidents during reheating of cooled sulfur, use melting pots that
have _____. - 🧠 ANSWER ✔✔Peripheral heating
The technician should use a stiff layer of _____ to cap fresh concrete
cylinders. - 🧠 ANSWER ✔✔Neat cement paste
Hardened concrete cylinders should be capped with _____, _____ or
_____. - 🧠 ANSWER ✔✔High-strength gypsum paste, neat cement paste,
or sulfur mortar
Plaster of paris and mixtures of plaster of paris and portland cement are
examples of suitable high strength plasters. True or False? - 🧠 ANSWER
✔✔False
Sulfur mortars and high-strength gypsum cement cubes must demonstrate
a minimum compressive strength of _____ or ___ __, whichever is greater.
- 🧠 ANSWER ✔✔35MPa (5000 psi), the cylinder strength