Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 40 pages
Exam (elaborations)

POPM Practice Tests from Purchase questions with verified answers.

Document preview thumbnail
Preview 4 out of 40 pages

POPM Practice Tests from Purchase questions with verified answers.

Content preview

POPM Practice Tests from Purchase questions with
verified answers
A Release Train Engineer has to attend multiple meetings to collect feedback,
conduct system reviews and give status updates at the end of each Iteration.
What action could he take to manage this better?
· Make status available at the end of every other Iteration rather than every
Iteration
· Encourage interested parties to attend the System Demo
· Delegate some reporting and meeting attendance to Scrum Masters on the train
· Determine the RTE's capacity for attending meetings and do not exceed it
Ans✓✓✓ Encourage interested parties to attend the System Demo


A successful PI planning event delivers
· Top ten Features
· A set of SMART committed objectives that are created by each team with the
business value assigned by the Business Owners
· Executive briefing
· Product vision briefing(s) Ans✓✓✓ A set of SMART committed objectives that
are created by each team with the business value assigned by the Business
Owners
(Correct)


A team's draft plan review should consist of which item at the end of the first day
of the PI Planning event?
· Risks and impediments
· Refined team backlogs

,· Iteration Goals
· ART delivery schedules Ans✓✓✓ Risks and impediments


A team's draft plan review should consist of which item at the end of the first day
of the PI Planning event?
· Solution delivery schedules
· Refined team backlogs
· Estimated capacity for each iteration Ans✓✓✓ Estimated capacity for each
iteration


At the end of day two of PI Planning event, the team's final plan review covers
what information?
· Changes to teams estimated capacity, final PI objectives, PI risks and
impediments
· Changes to iteration goals, measured velocity, and dependencies
· Epic, Capabilities and Team Features
· Planned Features, uncommitted objectives and Stories Ans✓✓✓ Changes to
teams estimated capacity, final PI objectives, PI risks and impediments


Besides having an EPIC Owner, what else should an Epic have?
· Definition of Done
· A Lean Business Case
· An Architecture Runway
· Budget Ans✓✓✓ A Lean Business Case

,Before being committed to implementation, epics require analysis, a Lean
business case, and a definition of the MVP. Epic Owners take responsibility for the
crucial collaborations needed to guide epics through this process.© Scaled Agile,
Inc.Include this copyright notice with the copied content.Read the FAQs on how
to use SAFe content and trademarks
here:https://www.scaledagile.com/about/about-us/permissions-faq/Explore
Training at:https://www.scaledagile.com/training/calendar/


https://scaledagileframework.com/epic/


Besides having an EPIC Owner, what else should an Epic have?
· The Definition of a Minimum Viable Product (MVP)
· An Economic Framework
· A Definition of Ready
· A Definition of Done Ans✓✓✓ The Definition of a Minimum Viable Product
(MVP)


Content of the Iteration Backlog is?
· Capabilities
· User Stories
· Enabler Epic
· Features Ans✓✓✓ User Stories


Content of the Team Backlog are?
· Capabilities
· User Stories

, · Features
· Enabler Epic Ans✓✓✓ User Stories


During each PI planning session, Product Management presents the vision, which
highlights the proposed features of the solution, along with any relevant
upcoming Milestones. They are also active participants in
· Iteration Backlog Refinement
· Lean budget establishment
· The Inspect and Adapt event
· External Team Retrospectives Ans✓✓✓ The Inspect and Adapt event


During Epic creation Lean Business Case can identify the impact on Sales and
which other areas?
· Release
· Decomposition
· Deployment
· Capacity Ans✓✓✓ Deployment


Enabler Epics are used to advance value stream in order to support upcoming
Business Epics?
· FALSE
· TRUE Ans✓✓✓ FALSE


Explanation
Enabler Epics are used to advance the Architectural Runway in order to support
upcoming Business Epics not to advance value stream

Document information

Uploaded on
May 1, 2025
Number of pages
40
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker
3.8
(400)
Sold
2162
Followers
1346
Items
50100
Last sold
18 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions