Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

CPSWQ Test Questions & Answers

Document preview thumbnail
Preview 3 out of 18 pages

CPSWQ Test Questions & Answers Large MS4 System - ANSWERSMunicipal Separate Storm Sewer System. Serve population of 250,000 or more Meander Width Ratio - ANSWERSbelt width/bankfull width Not considered water of the united states - ANSWERSprior converted cropland; waste treatment systems (e.g. treatment ponds/lagoons) What if a CPSWQ is fraudulent: - ANSWERSRule 2.16 1. advice against decision 2. refuse to consent 3. report decision to authority NTU - ANSWERSNephelometric Turbidity Unit What is a measure of turbidity: - ANSWERSAmount of material suspended in water. Increasing this parameter of water decreases amount of light that penetrates the water column. High levels are harmful to aquatic life. Rule 3:12 - ANSWERSECI Professionals shall undertake to perform pro services only when they, together with those whom they may engage as consultants, are qualified by education, training, or experience in specific technical areas involved.

Content preview

CPSWQ Test Questions &
Answers

Large MS4 System - ANSWERSMunicipal Separate Storm Sewer System. Serve population of
250,000 or more



Meander Width Ratio - ANSWERSbelt width/bankfull width



Not considered water of the united states - ANSWERSprior converted cropland; waste treatment
systems (e.g. treatment ponds/lagoons)



What if a CPSWQ is fraudulent: - ANSWERSRule 2.16

1. advice against decision

2. refuse to consent

3. report decision to authority



NTU - ANSWERSNephelometric Turbidity Unit



What is a measure of turbidity: - ANSWERSAmount of material suspended in water. Increasing
this parameter of water decreases amount of light that penetrates the water column. High
levels are harmful to aquatic life.



Rule 3:12 - ANSWERSECI Professionals shall undertake to perform pro services only when they,
together with those whom they may engage as consultants, are qualified by education, training,
or experience in specific technical areas involved.

,Ethical Standard 3:5 - ANSWERSECI Professionals should employ reasonable safeguards in
systems and practices to protect confidentiality of project materials (both analogue and digital)



5 fundamental principles - ANSWERS1.Intergrity

2.Objectivity

3.Confidentiality

4.Competence

5.Professionalism



Pollutant Concentrations are best used for_______ term impact. - ANSWERSShort term impact



SWPPP - ANSWERSStorm Water Pollution Prevention Plan- plan required by storm water
regulations/permits includes site maps, identification.



NURP - ANSWERSNationwide Urban Runoff Program

1987-1983

led to EPA regulating storm water



Which sediment has most potential for erosion: - ANSWERSSilt



Which SWP used chemical, physical and biological processes: - ANSWERSSaltation- movement
of intermediate size (0.05-0.5 mm) particles that are lifted short distances into the air and then
fall back to dislodge more soil. Accounts for over 50% total soil movment



Rooftop top pollutant of concern: - ANSWERSZinc



Which is a measurement of sediment: - ANSWERSTSS, SSC, SSTS, Turbidity

, Which is a micropollutant: - ANSWERSFloatable debris, total P



Which pollutant adheres to sediment: - ANSWERSTP, oil & Grease



Water Quality Standards purpose: - ANSWERSWell being of survival of man, plants, and wildlife.



TMDL (Total Maximum Daily Load) - ANSWERSCWA Section 303- established by Clean Water Act
to guide application of state water quality standards to individual bodies of water and
watersheds by defining the amount of a particular pollutant a water body can absorb on a daily
basis without violating applicable water quality standards.



Purpose of the Clean Water Act: - ANSWERSFederal Water Pollution Act (1948)- CWA (1972)-
restoring and maintaining chemical, physical, and biological integrity of US waters



At what frequency should a construction be inspected for maximum success: - ANSWERSWeekly



When inspecting a construction what is the first thing which should be considered: -
ANSWERSSafety and Communication



Perk test: - ANSWERSType of measuring conducted by drilling a hole in ground, pouring water
into the hole and observing the rate which the water is absorbed into the soil



Taking a picture--what critical information should be accompanied: - ANSWERS1. Location

2. Time

3. Date



What percentage of a construction site must be stabilized before NOT: - ANSWERS70%

Document information

Uploaded on
April 26, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bensuda
3.7
(164)
Sold
898
Followers
445
Items
23098
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions