The lean ratio of an extension ladder - 4:1
According to a Hera, to complete a response action of a non-NESHAP size project how many samples
must be taken with results of what? - 5 samples taken inside with results of each 0.0 f/cc
What are the notification requirements in Virginia? - 20 calendar days for any project greater than 10
ft.² or linear feet
In what US jurisdiction do individuals need an asbestos supervisor or working license? - Need a
license everywhere
Type of bond that would ensure that the general contractor will compensate sub contractors for
labor and materials? - Performance bond
Minimum respiratory protection on a class one asbestos project with no NEA? - Full face air, purifying
respirator
What is the maximum content permitted in the work area where an air purifying respirator is being
worn? - 23.5%
Xrays must be evaluated by what class reader? - Class B
What is the APF for a full face air purifying respirator? - 50
Friable ACM is it any material that can be? - Crash pulverized, reduced to powder by hand pressure
when dry
The OSHA permissible exposure limit is? - 0.1 f/CV over 8 hours TWA