Quality assurance is defined as - (answers)plans or action taken by an agency that provides
confidence that a product or service with be satisfactory/adequate
I-15
A Quality Assurance program serves as - (answers)the framework necessary for construction
Quality Assurance implementation
I-18
The making and revision of QA specs should include... - (answers)agency and industry personnel
心的坚强决定了我们的命运。当
(engineers, inspectors, technicians)
我们面对挫折时,是一颗不屈的
I-19
心让我们勇敢前行
The 6 elements used in "design bid build" QA programs are the same as "Design build"
construction QA programs - (answers)True
I-22
Quality control activities include... - (answers)Sampling, testing and visual inspection
I-24
QC plans ... - (answers)-are Project Specific
- Address specific processes for individual categories of work on a construction process
I-25
Acceptance is the responsibility of ... - (answers)the transportation agency
, I-26
Engineering limits are ... - (answers)the absolute threshold values for individual test results
I-29
QA specs use - (answers)Quality measures
I-28
The purpose of IA is to... - (answers)identify discrepancies or differences in testing procedures or
equipment
I-34
IA comparison is performed on ...心的坚强决定了我们的命运。当
- (answers)split samples
I-34 我们面对挫折时,是一颗不屈的
心让我们勇敢前行
If contractor QC test results are not used in acceptance... - (answers)a dispute resolution system
is not needed
I-35
All agency central labs are ... - (answers)required to be accredited through AASHTO
accreditation program AAP
Qualification/certification personnel should be... - (answers)required to re-cert every 2-5 yrs
I-40
Each agency construction QA program must meet - (answers)23 CFR 637B and is required to be
approved by FHWA
I-41
100% RATED CORRECT ANSWERS 2025 LATEST UPDATED 100%
(ACCURATE ) GET A+!!
Quality assurance is defined as - (answers)plans or action taken by an agency that provides
confidence that a product or service with be satisfactory/adequate
I-15
A Quality Assurance program serves as - (answers)the framework necessary for construction
Quality Assurance implementation
I-18
The making and revision of QA specs should include... - (answers)agency and industry personnel
心的坚强决定了我们的命运。当
(engineers, inspectors, technicians)
我们面对挫折时,是一颗不屈的
I-19
心让我们勇敢前行
The 6 elements used in "design bid build" QA programs are the same as "Design build"
construction QA programs - (answers)True
I-22
Quality control activities include... - (answers)Sampling, testing and visual inspection
I-24
QC plans ... - (answers)-are Project Specific
- Address specific processes for individual categories of work on a construction process
I-25
Acceptance is the responsibility of ... - (answers)the transportation agency
, I-26
Engineering limits are ... - (answers)the absolute threshold values for individual test results
I-29
QA specs use - (answers)Quality measures
I-28
The purpose of IA is to... - (answers)identify discrepancies or differences in testing procedures or
equipment
I-34
IA comparison is performed on ...心的坚强决定了我们的命运。当
- (answers)split samples
I-34 我们面对挫折时,是一颗不屈的
心让我们勇敢前行
If contractor QC test results are not used in acceptance... - (answers)a dispute resolution system
is not needed
I-35
All agency central labs are ... - (answers)required to be accredited through AASHTO
accreditation program AAP
Qualification/certification personnel should be... - (answers)required to re-cert every 2-5 yrs
I-40
Each agency construction QA program must meet - (answers)23 CFR 637B and is required to be
approved by FHWA
I-41