Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

CM 4221 Final Examination Questions and Complete Solutions Graded A+

Document preview thumbnail
Preview 3 out of 24 pages

CM 4221 Final Examination Questions and Complete Solutions Graded A+

Content preview

CM 4221 FINAL EXAMINATION
QUESTIONS AND COMPLETE
SOLUTIONS GRADED A+




Your Exam Plug


,Which of the following is not a method used to procure a constructor?



Select one:

a. None of these

b. Best value

c. Job order contracting

d. Low bid

e. Qualifications-based selection - Answer: c. Job order contracting



Which management activity listed below is where the project manager is tasked with coordinating
subcontractors, planning sequences of construction, and developing effective communication?



Select one:

a. None of these

b. Controlling

c. Organizing

d. Scoping

e. Planning - Answer: c. organizing



This testing process helps to reduce the risk that major project systems (HVAC, electrical, etc) will work
according to the project objectives, plans, and specifications.



Select one:

a. Commissioning

b. As-builts

c. None of these

d. Notice to Proceed

e. Constructability review - Answer: a. commisioning

, Vertical building projects are first designed by an architect and then engineered by design engineers
while horizontal infrastructure projects are typically designed and engineered by design engineers



True

False - Answer: True



Based on laws and regulations, privately financed projects must utilize competitive bidding to procure a
construction firm.



Select one:

True

False - Answer: False



An agency construction manager firm is contracted with the Owner, lead designer, and construction firm
on a project.



Select one:

True

False - Answer: false



A program manager is the same as a project manager.



Select one:

True

False - Answer: false



During the early stages of the engineering and design phase of a project, the Owner typically procures
the lead design firm using qualifications-based selection.



Select one:

Document information

Uploaded on
April 21, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.2
(73)
Sold
218
Followers
27
Items
17842
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions