CM 4221 FINAL EXAMINATION
QUESTIONS AND COMPLETE
SOLUTIONS GRADED A+
Your Exam Plug
,Which of the following is not a method used to procure a constructor?
Select one:
a. None of these
b. Best value
c. Job order contracting
d. Low bid
e. Qualifications-based selection - Answer: c. Job order contracting
Which management activity listed below is where the project manager is tasked with coordinating
subcontractors, planning sequences of construction, and developing effective communication?
Select one:
a. None of these
b. Controlling
c. Organizing
d. Scoping
e. Planning - Answer: c. organizing
This testing process helps to reduce the risk that major project systems (HVAC, electrical, etc) will work
according to the project objectives, plans, and specifications.
Select one:
a. Commissioning
b. As-builts
c. None of these
d. Notice to Proceed
e. Constructability review - Answer: a. commisioning
, Vertical building projects are first designed by an architect and then engineered by design engineers
while horizontal infrastructure projects are typically designed and engineered by design engineers
True
False - Answer: True
Based on laws and regulations, privately financed projects must utilize competitive bidding to procure a
construction firm.
Select one:
True
False - Answer: False
An agency construction manager firm is contracted with the Owner, lead designer, and construction firm
on a project.
Select one:
True
False - Answer: false
A program manager is the same as a project manager.
Select one:
True
False - Answer: false
During the early stages of the engineering and design phase of a project, the Owner typically procures
the lead design firm using qualifications-based selection.
Select one:
QUESTIONS AND COMPLETE
SOLUTIONS GRADED A+
Your Exam Plug
,Which of the following is not a method used to procure a constructor?
Select one:
a. None of these
b. Best value
c. Job order contracting
d. Low bid
e. Qualifications-based selection - Answer: c. Job order contracting
Which management activity listed below is where the project manager is tasked with coordinating
subcontractors, planning sequences of construction, and developing effective communication?
Select one:
a. None of these
b. Controlling
c. Organizing
d. Scoping
e. Planning - Answer: c. organizing
This testing process helps to reduce the risk that major project systems (HVAC, electrical, etc) will work
according to the project objectives, plans, and specifications.
Select one:
a. Commissioning
b. As-builts
c. None of these
d. Notice to Proceed
e. Constructability review - Answer: a. commisioning
, Vertical building projects are first designed by an architect and then engineered by design engineers
while horizontal infrastructure projects are typically designed and engineered by design engineers
True
False - Answer: True
Based on laws and regulations, privately financed projects must utilize competitive bidding to procure a
construction firm.
Select one:
True
False - Answer: False
An agency construction manager firm is contracted with the Owner, lead designer, and construction firm
on a project.
Select one:
True
False - Answer: false
A program manager is the same as a project manager.
Select one:
True
False - Answer: false
During the early stages of the engineering and design phase of a project, the Owner typically procures
the lead design firm using qualifications-based selection.
Select one: