Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

Tennessee Septic System Exam: Questions With Correct Solutions

Document preview thumbnail
Preview 2 out of 8 pages

Tennessee Septic System Exam: Questions With Correct Solutions

Content preview

Tennessee Septic System Exam: Questions With
Correct Solutions
How many years from the date of issuance is a septic permit good
for? Correct Ans - 3 Years

The minimum square footage of a trench bottom installed per
bedroom shall be? Correct Ans - 370

Soil absorption rates greater than ______ minutes per inch are
considered unsuitable for a conventional subsurface sewage system.
Correct Ans - 75

Soil percolation rates less than _____ minutes per inch may be used
for conventional systems under authority of TCA. Correct Ans -
106

Recirculating design is where the elevation in the area utilized for
the absorption field does not exceed____ inches Correct Ans -
12

Recirculating design--- Connecting successive trenches on both ends
and by maintaining the grade in the bottom of these trenches from
_____ to no more than _______ inches Correct Ans - Level, 4

Serial distribution system Correct Ans - This design is
preferred where the elevation difference of the ground surface over
the absorption field area exceeds 12 Inches.

Large Conventional Systems Correct Ans - Those exceeding
2250 square feet of disposal field

, When the design daily flow from a single source exceeds 3000
gallons per day, _______ or ________ shall be used which shall discharge
to separate disposal fields. Each System shall not exceed a design
capacity of ________ gallons per day Correct Ans - Siphons,
Pumps, 3000

The pipe size from the septic tank to the disposal field or pump
chamber shall not be less than ____ inches in diameter and shall be
Schedule ____ PVC Correct Ans - 3, 40

There must be a minimum of ____ feet of undisturbed earth between
adjacent trench walls shall be required. Correct Ans - 6

Pipe for relief lines shall have no ______ and shall have a minimum
inside diameter of ____ inches and conform to or exceed the
standards of ASTM, however Schedule ___ pipe, or its equivalent
with a minimum inside diameter of ____ inches may be used
Correct Ans - perforations, 4, 40, 3

Invert of the overflow pipe in the first relief line shall be at least _____
inches lower than the invert of the septic tank outlet. Correct Ans
- 4

Trenches shall not be excavated when the soil is? Correct Ans -
wet enough to smear or compact easily.

Media for disposal fields shall consist of _________, _________ or ________
They shall be size numbers ____, ____, _____, or________ coarse
aggregate.
The material shall be free from ______, ________, __________, or________
Atleast 90 percent of the material must pass a ______ inch screen and
not more than 5 percent may pass a ______ inch screen. Correct Ans
- Crushed rock, gravel, other suitable material
2, 3, 4, 24

Document information

Uploaded on
April 20, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyHall
3.8
(231)
Sold
1347
Followers
825
Items
17187
Last sold
13 hours ago

Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions