Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 41 pages
Exam (elaborations)

GENERAL CONTRACTOR LICENSE IN ARIZONA QUESTIONS WITH 100% VERIFIED ANSWERS

Document preview thumbnail
Preview 4 out of 41 pages

GENERAL CONTRACTOR LICENSE IN ARIZONA QUESTIONS WITH 100% VERIFIED ANSWERS

Content preview

GENERAL CONTRACTOR LICENSE IN ARIZONA
QUESTIONS WITH 100% VERIFIED ANSWERS
When a repair must be performed in a emergency situation, when shall the permit application
be submitted? - ✔✔The next working business day
Section 105.2.1 Emergency Repairs



Once the permit has been issued, how long is it valid? - ✔✔180 days
Section 105.5- Expiration



How long should a permit remain at the site of the work? - ✔✔Until the completion of the
project
Section 105.7 Placement of permit



What included within the "Exterior wall envelope"? - ✔✔flashing intersections with
dissimilar materials, corners, end details, control joints, intersections at roofs, eaves or
parapets, means of drainage, water-resistive membranes and details around openings.



Built-Up roof covering consist of - ✔✔Two or more layers of felt cemented together and
surfaced with a cap sheet, mineral aggregate, smooth coating or similar surfacing material
Chapter 2- Definition-Built-up Roof covering


Positive roof drainage will ensure drainage of the roof within ___ hours of precipitation -
✔✔48 hours
Chapter 2 Positive roof drainage



An example of a live load on a roof includes? - ✔✔During maintenance by workers, during
the life of the structure by movable objects, and by the use and occupancy of the roof for roof
gardens or assembly areas

,Chap 2 Live loads, ROOF


A _____ is the process of installing an additional roof covering over a prepared existing roof
covering without removing the existing roof. - ✔✔Roof Recover
Chap 2 Definitions roof recover


Parapet walls shall be not less than _____ inches above the point where the roof surface and
the wall intersect - ✔✔30 inches
Section 705.11.1 Parapet Construction



What is the requirement for combustible roof insulation? - ✔✔It must be covered by an
approved roof covering
Section 720.5 roof insulation


An opening not less than 20"x30" shall be provided to any attic area having a clear height of
over_____ - ✔✔30 inches
Section 1208.2 Access to Unoccupied Spaces- Attics Spaces


Flashing shall be installed at the perimeters of exterior door and window assemblies,
penetrations and terminations of exterior wall assemblies, and what other locations? -
✔✔Exterior wall intersections with roofs, chimneys, porches, decks, balconies and similar
projections and at built-in gutters and similar locations where moisture could enter the wall
Section 1404.4 Installation of wall covering flashing


When a scupper is used as secondary roof drainage, what is the minimum opening size of the
scupper? - ✔✔4 inches
Section 1502.3 Scuppers


A cricket shall be installed where a roof penetration is greater than ___ inches wide when
measured perpendicular to the slope? - ✔✔30 inches

,Section 1503.5 Cricket and Saddles


A building with aggregate roofing in an area with a nominal design wind speed of 110 mph in
exposure category C can have a maximum roof height of how many feet - ✔✔No permitted
Table 1504.8 Table for Maximum allowed mean roof height permitted for buildings aggregate
on the roof outside an HVHZ


How many layers of underlayment are required for an asphalt shingle roof with a slope of 2:12?
- ✔✔2 layers
Section 1507.2.2- Asphalt Shingles Slope


How far into asphalt shingle roofing materials shall fasteners penetrate into the roof sheathing?
- ✔✔Minimum of 3/4"
Section 1507.2.5 Fasteners


An ice barrier shall extend from the lowest edge of the roof surface a point at least ___ inside
the exterior wall line of the building - ✔✔24 inches
Section 1507.2.1 Ice barrier



What is the minimum thickness, in inches, of cap flashing for a roof? - ✔✔.019 inches
Section 1507.2.8.1 Base and cap flashing


For a tile roof with a slope of 5 in 12, what is the minimum number of layers of underlayment
and lap? - ✔✔1 layer lapped 2 inches
Table 1507.1.1(2) - Clay and concrete tile



Valley flashing shall extend at least ____ from the centerline of the valley each way. - ✔✔11
inches
Section 1507.3.9 - Flashing

, What is the minimum roof slope allowed for the installation of standing-seam metal roof
panels? - ✔✔1/4 unit vertical in 12 horizontal
Section 1507.4.2- Metal Roof Panels-Deck slope #3



What is the head lap of slate shingle installed on a roof that is 5 in 12? - ✔✔4 inches
Table 1507.7.6 Slate Shingle Head Lap



What is the minimum slope allowed for the installation of wood shingles? - ✔✔3 units
vertical in 12 units horizontal
Section 1507.8.2 Wood shingles - Deck Slope


What is the minimum nominal thickness of spaced sheathing boards used as decking for wood
shakes? - ✔✔1 inch
Section 1507.9.1-wood shakes-deck requirements


A 90 clock tower which is 500 sf in area would be required to be constructed of and supported
on what type of construction? - ✔✔Type I or II conctruction
Section 1510.5 Towers, spires, domes and cupolas


Roof replacement is required to remove all layers of roofing down to the roof deck except for :
ice barrier membranes which are adhered to the roof deck. Where the existing roof cover is
wood shake, slate, clay, cement or asbestos cement tile - ✔✔Ice barrier membranes which
are adhered to the roof deck
Section 1511.3 Roof replacement-Exception:


A new metal panel roof covering can be installed over what type of existing roof covering ? -
✔✔Wood shakes
Section 1511.3.1 Roof recover-exception 3

Document information

Uploaded on
April 18, 2025
Number of pages
41
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
114
Followers
5
Items
23937
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions