Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

VIVINT SMART HOME PRO FINAL EXAM 2025 |GUARANTEED ACCURATE ANSWERS

Document preview thumbnail
Preview 2 out of 12 pages

12-24v - ACCURATE ANSWERS What is the input voltage range of the Doorbell Cam? 16.5 VAC - ACCURATE ANSWERS What is the output voltage of the transformer used to power the SkyControl panel? true - ACCURATE ANSWERS True or False: When programming a sensor into the sky panel you can type in the serial number or "learn" it in by triggering the device 2 - ACCURATE ANSWERS When programming a DW21, which loop number is used? 1 2 3 beans and wire caps - ACCURATE ANSWERS Which of the following materials can you use to group multiple ground terminals in a takeover module: Solder String Wire Caps Duct Tape Beans True -

Content preview

VIVINT SMART HOME PRO FINAL
EXAM 2025 |GUARANTEED
ACCURATE ANSWERS

12-24v - ACCURATE ANSWERS✔✔ What is the input voltage range
of the Doorbell Cam?


16.5 VAC - ACCURATE ANSWERS✔✔ What is the output voltage of
the transformer used to power the SkyControl panel?


true - ACCURATE ANSWERS✔✔ True or False: When programming a
sensor into the sky panel you can type in the serial number or "learn" it
in by triggering the device


2 - ACCURATE ANSWERS✔✔ When programming a DW21, which
loop number is used?
1
2
3


beans and wire caps - ACCURATE ANSWERS✔✔ Which of the
following materials can you use to group multiple ground terminals in a
takeover module:

, Solder
String
Wire Caps
Duct Tape
Beans


True - ACCURATE ANSWERS✔✔ T or F: When installing the
firefighter, it is required to test the customer's existing smoke detectors


3/4" - ACCURATE ANSWERS✔✔ When installing a DW21, what size
bit should you use to drill the hole for the sensor?
1/2"
3/8"
3/4"
1"


True - ACCURATE ANSWERS✔✔ T or F: When installing the TAKE-
345, you must ensure that the transformer is supplying power to the
power supply before the battery.


True - ACCURATE ANSWERS✔✔ T or F: You are required to test
signals from all secondary keypads and key fobs even though they are
not detection devices

Document information

Uploaded on
April 17, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMLINKS
3.1
(17)
Sold
67
Followers
6
Items
3532
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions