• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

Asphaltic Concrete Paving Inspection 1 UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 3 out of 18 pages

Asphaltic Concrete Paving Inspection 1 UPDATED ACTUAL Exam Questions and CORRECT Answers List four common uses of asphaltic concrete - CORRECT ANSWER wearing course binder course shoulders airport runways parking areas - base course what are two basic materials used to make asphaltic concrete - CORRECT ANSWER aggregate & asphalt cemen

Content preview

Asphaltic Concrete Paving Inspection 1
UPDATED ACTUAL Exam Questions and
CORRECT Answers
List four common uses of asphaltic concrete - CORRECT ANSWER - base course
wearing course
binder course
shoulders
airport runways
parking areas


what are two basic materials used to make asphaltic concrete - CORRECT ANSWER -
aggregate & asphalt cement


what is a common term for asphaltic concrete - CORRECT ANSWER - hot mix asphalt



which documents form the contract requirements - CORRECT ANSWER - change orders/
special agreements
special provisions
plans
supplemental specs
standard specs
standard plans


if there were a conflict between the plans and special provisions for a project, which document
would take precedence - CORRECT ANSWER - special provisions


which of the following pavements could be constructed of asphaltic concrete - CORRECT
ANSWER - all of the above -- airport runways , base course, shoulders

,which of the following are always components of asphaltic concrete - CORRECT
ANSWER - a and b only (aggregates & asphalt cement)


which of the following terms correctly refers to asphaltic concrete - CORRECT
ANSWER - hot mix asphalt


which of the following documents list the specifications for the requirements of mixes
commonly allowed by DOTD - CORRECT ANSWER - standard specifications for roads
and bridges


which of the following documents specifies which mix is to be used for a particular project -
CORRECT ANSWER - plans


which of the following contract documents governs over the plans - CORRECT
ANSWER - special provisions


list three pieces of paving equipment that must be certified for performance before they are used
on a DOTD project - CORRECT ANSWER - asphalt distributors, paver, haul trucks, roller



certification for paving equipment is required every __ years - CORRECT ANSWER -2


who is responsible for in-depth certification, paving equipment must have a review inspection
every ___ days - CORRECT ANSWER - District lab engineer & 90 days


who is responsible for daily inspections of the performance of certified paving equipment -
CORRECT ANSWER - paving inspector


if a piece of certified paving equipment fails to perform satisfactory, whom should the inspector
notify - CORRECT ANSWER - P.E. and District lab engineer

, what form is used to document the certification inspection of paving equipment - CORRECT
ANSWER - asphalt concrete paving equipment form


what does a paving inspector look for on a piece of equipment that verifies that it has been
certified - CORRECT ANSWER - silver performance certification sticker


the piece of equipment used to apply asphaltic material to a prepared surface is called an -
CORRECT ANSWER - asphaltic distributor


three materials which may be used to protect the prepared surface and to act as a bonding agent
between the surface and the asphalt concrete are - CORRECT ANSWER - asphalt cement,
cutback, emulsion


list two types of thermometers that may be found on asphalt distributors - CORRECT
ANSWER - armored, dial



what is the most commonly used asphaltic bonding agent - CORRECT ANSWER - tack
coat


list two devices which may be used to measure the amount of tack in the distributor - CORRECT
ANSWER - gauge, graduated measuring stick


to determine application rate, when should the inspector measure the amount of asphaltic
material in the distributor - CORRECT ANSWER - at the start and finish of the application


if there were 187 gallons of asphaltic material in the distributor tank before the tack application,
and 82 gallons upon completion of the application, how many gallons of tack were applied -
CORRECT ANSWER - 187-82= 105 gallons


where will the graduated measuring stick be located on an asphalt distributor - CORRECT
ANSWER - in the well near the hatch or in the hatch

Document information

Uploaded on
April 17, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(241)
Sold
1681
Followers
109
Items
121806
Last sold
3 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions