KENTUCKY BOILER KRS 236 STUDY GUIDE 2025/2026
QUESTIONS WITH ANSWERS GRADED A+
✔✔Noncode boiler or pressure vessel - ✔✔A boiler or pressure vessel that does not
BEAR THE ASME CODE SYMBOL and Designator

✔✔Owner User Inspector - ✔✔An inspector commissioned by the department and
employed by a company pirating a pressure vessel within the Commonwealth and
meeting requirements set by KRS 236

✔✔PVHO - ✔✔Pressure Vessels for Human Occupancy

✔✔PVHO Pressure Rating Definition - ✔✔Under internal or external pressure
exceeding a differential pressure of 2 psi. Includes decompression or recompression
changers, high altitude chambers, hypo/hyperbaric chambers, and hyperbaric
stretchers.

✔✔Repair - ✔✔Work necessary to restore pressure retaining items to a safe and
satisfactory operating condition

✔✔Secondhand Boiler or Pressure Vessel - ✔✔Boiler or pressure vessel where the
boiler and ownership have been changed after initial use

✔✔State Special - ✔✔Boiler or pressure vessel that carries neither the ASME or NB
registration/symbol but has been accepted by the department

✔✔ASME Stamps - ✔✔New Boilers and pressure vessels shall be stamped with the
applicable certification mark of the ASME Boiler and Pressure Vessel Code

✔✔National Board Inspection Code Part 1 - ✔✔All boilers and pressure vessel
installations shall conform to this code

✔✔If pressure or temperature exceeds MADP device cannot function unless... - ✔✔1-
Temperature and Pressure controls on the boiler are permanently set to prevent
operation in excess
2- Safety Valves shall be installed on the boiler

✔✔ASME Code Section IX (9) - ✔✔Piping code for welded joints in pressure piping
installed by qualified professionals

✔✔Manufactures Data Report - ✔✔Report on all boilers of steel construction and
pressure vessels constructed in accordance with the ASME Boiler Code

, ✔✔Timeframe from inspection request to completion - ✔✔Inspection shall take place
within 7 days of request

✔✔State Registration - ✔✔At the time of first inspection, a Commonwealth of Kentucky
registration number shall be assigned to the boiler and shall be a metal tag affixed near
the manufacturer's data plate

✔✔The boiler installation contractor - ✔✔Who is responsible for the quality of the
welding?

✔✔Welded Piping Joints - ✔✔Shall be visually inspected for full root penetration,
soundness of weld, freedom from undercutting,, cracking, or any other imperfections. If
visual shows potential defect, inspector may require further "non destructive" tests

✔✔70 degrees to 120 degrees - ✔✔Minimum/Maximum temperature for the water in
hydrostatic tests.

✔✔Alternative (to Hydrostatic) Testing - ✔✔- Compressed Air Systems with a MAWP of
200 psi or less and a pipe dia. Of 2" and no welds
- Hydronic Heating with a MAWP of 100 psi or less with 2" dia or less and no welds
- Steam condensate systems with a MAWP of 50 psi, pipe dia less than 2" and no welds
- Non Amonia Systems with pipe dia of 2" or less and no welds

✔✔When documentation of materials used is provided to the inspector. - ✔✔When can
a pipe be painted prior to inspection?

✔✔True - ✔✔T/F: Design drawings and calculations shall be certified by a mechanical
engineer holding a PE certification with a background in boilers and pressure vessels

✔✔True - ✔✔The resetting of safety valves shall be done by a V-R stamp holder

✔✔21% - ✔✔Value over the MAWP that a pressure relief valve is capable of preventing
failure

✔✔Relieving capacity - ✔✔The minimum relieving capacity of the safety valve for safety
relief valves shall be equal to or exceed the MAWP

✔✔3 gauge cocks - ✔✔How many gauge cocks are required for manually fired boilers
within rang of the visible water glass

✔✔2' in all directions - ✔✔How much clearance should be allowed in for boiler
installation?

✔✔5' - ✔✔Clearance between the manhole opening and any wall, ceiling or piping?

Document information

Uploaded on
April 15, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
287
Followers
11
Items
36004
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions