Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

KENTUCKY BOILER KRS 236 EXAM SCRIPT 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Document preview thumbnail
Preview 2 out of 8 pages

KENTUCKY BOILER KRS 236 EXAM SCRIPT 2025/2026 QUESTIONS WITH ANSWERS GRADED A+ Where are funds held collected from inspections? - Trust and agency fund How long do you have to file a grievance with the department for an administrative hearing? - 15 days Where is the petition filed for a grievance with the Department? - Franklin Circuit Court Do you need a contractor's license to erect boilers? - Yes How often do contractor's need to renew their licenses' for construction? - Annually * First of the month following expiration Upon suspension or revocation of a license, how long does the Department have to provide notice? - Written notice must be provided within 10 Days What is the cost for a replacement license? - $5 What do permit fees for installation / erection / repair of boilers or pressure vessels include? - Initial / Final Inspection

Content preview

KENTUCKY BOILER KRS 236 EXAM SCRIPT 2025/2026
QUESTIONS WITH ANSWERS GRADED A+
✔✔Where are funds held collected from inspections? - ✔✔Trust and agency fund

✔✔How long do you have to file a grievance with the department for an administrative
hearing? - ✔✔15 days

✔✔Where is the petition filed for a grievance with the Department? - ✔✔Franklin Circuit
Court

✔✔Do you need a contractor's license to erect boilers? - ✔✔Yes

✔✔How often do contractor's need to renew their licenses' for construction? -
✔✔Annually * First of the month following expiration

✔✔Upon suspension or revocation of a license, how long does the Department have to
provide notice? - ✔✔Written notice must be provided within 10 Days

✔✔What is the cost for a replacement license? - ✔✔$5

✔✔What do permit fees for installation / erection / repair of boilers or pressure vessels
include? - ✔✔Initial / Final Inspection

✔✔During an emergency, how long do owner / operators have until permits must be
submitted to the Department? - ✔✔30 Days to file

✔✔Do Department inspectors need to call ahead before an inspection? - ✔✔No

✔✔Operating without a valid certificate for a boiler or pressure vessel is considered
what kind of violation? - ✔✔Class B Misdemeanor

✔✔What is the financial penalty for operating a boiler or pressure vessel without a valid
certification? - ✔✔No Less than $10 / No more than $500 Per day

✔✔DEAERATOR TANK - ✔✔Pressure vessel in which water is heated, usually by
steam so that any O2 is removed from the water

✔✔EXISTING INSTALLATION - ✔✔Prior Existing Structures Before:
July 15, 1970
July 15, 1980

, ✔✔HEAT RECOVERY BOILER - ✔✔Boiler in which source of heat is from other
processes

✔✔Heating Boiler - ✔✔KRS 236.010c Operates under 15 psig / not to exceed 160 psi
w/ heat under 250 F

✔✔High Pressure / High Temperature Boiler - ✔✔KRS 236.010 160 psig w/
Temperatures above 250 F

✔✔Hot water heating boiler - ✔✔Hot water is circulated for heating purposes

✔✔Hot Water Storage Tank - ✔✔Pressure Vesse, unfired, but subject to sam
epressures as a companion hot water supply boiler (External Use)

✔✔Hot Water Supply Boiler - ✔✔filled with water that furnishes hot water to be used
externally. >210F >160 psig

✔✔Hydrostatic Test - ✔✔Pressure test with water to test for tightness or mechanical
integrity

✔✔Jacketed Kettle - ✔✔Pressure vessel w/ inner and outer walls that is subject to
water or steam pressure

✔✔Lined potable water Boiler - ✔✔Water boiler w/ a corrosion resistant lining used to
supply potable water

✔✔National Board of Boiler and Vessel Inspectors - ✔✔NB

✔✔Who is the Chairman of the Department? - ✔✔Chief Boiler Inspector

✔✔Who appoints the members of the board? - ✔✔Governor

✔✔How many votes shall the board have to pass policy? - ✔✔5

✔✔Do members of the board take a salary? - ✔✔No

✔✔What Code shall a boiler or pressure vessel computed to if it does not have an
ASME code Symbol (Special Boiler) - ✔✔API 579 / ASME FFS-1 (Fit For Seravice)

✔✔What information must be on the tag of of the certified boiler? - ✔✔1. Registration
Number
2. Manufacturer's Name

Document information

Uploaded on
April 15, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
287
Followers
11
Items
36004
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions