CSI CDT FINAL PAPER 2025/2026 QUESTIONS WITH
ANSWERS GRADED A+
✔✔Construction Manager at Risk (CMaR) - ✔✔-bring in someone knowledgeable on
construction topics at an early stage, while construction documents are being
developed.
-the construction professional cannot bid on the project now

✔✔Design-Bid (D-B) - ✔✔-designer-builder provides all services
-use the Owner's A/E
-one prime contract
-typically the contractor is the lead and the A/E is the sub

✔✔Owner-Build (O-B) - ✔✔-one contract with the A/E
-Owner is controlling the entire project
-don't need full set of contract documents for this type of build

✔✔Integrated Project Delivery (IPD) - ✔✔All participants collaborate closely from the
projects earliest conceptualization to move in. Owner has multiple agreements with
independent design and construction firms

✔✔How to select design services - ✔✔Not based on money, but rather qualifications,
experience, and unique design skills

✔✔How to select contract services - ✔✔Lowest competitive bidder, reputation, previous
relationship with the Owner, or primary selection methods

✔✔Project Variables - ✔✔Allowances
Alternates
Unit Prices

used to control:
-indeterminate items, unknowns, and contingencies
-postponement of decisions until more information is known (i.e. cost)
-identification and control of construction costs

✔✔Allowances - ✔✔A monetary amount or quantity not otherwise defined in the
contract documents that the contractor is required to include in a project

✔✔Cash Allowance - ✔✔A monetary sum that the bidder includes as part of the
contract sum to account for certain items to be determined at a later time. *SHOWN ON
DRAWINGS*

, ✔✔Quantity Allowance - ✔✔Specified quantity of a product or assembly that the bidder
includes in the the scope of the work when location of work is undefined *NOT SHOWN
ON DRAWINGS*

✔✔Alternates - ✔✔A defined portion of the work that is priced separately and thus
provides an option for the owner in selecting the final scope of the project

✔✔Unit Price - ✔✔A cost quoted by a bidder or contractor for a single, specified unit of
work.
Useful when nature of work is known, but extent of work is unknown or likely to change
*SHOWN ON DRAWINGS*

✔✔Life cycle cost - ✔✔Based on the total cost of ownership rather than the initial costs
Considerations that influence life cycle costs:
-design decisions about materials and equipment
-maintenance, operation, and replacement of materials and equipment
-alterations, renovations, and improvements
-initial construction

✔✔value analysis - ✔✔Getting the most "bang for your buck"

✔✔Design Considerations (6 of them) - ✔✔Aesthetics
Regulatory requirements (codes and regulations)
Functional elements (adequate space for design, suitability to construction type used,
....)
Constructability
Sustainability
Budget

✔✔What is included in Construction Documents - ✔✔Procurement requirements +
contract documents

✔✔What is included in Procurement Requirements - ✔✔-solicitation or request for
proposal
-instructions for procurement
-available information
-procurement forms and supplements

✔✔Bid vs Proposal - ✔✔Bid = offer to perform work or supply materials or goods at a
specific price - response to a solicitation - usually PUBLIC
Proposal = offer of terms and conditions fo Work - response to a request for proposal -
usually PRIVATE

✔✔Solicitation - ✔✔-invitation to bid = Owner is selective by only inviting certain bidders
-advertisement to bid = Owner accepts all qualified bidders

Document information

Uploaded on
April 15, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
284
Followers
10
Items
33387
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions