John is a project manager at Moonzing, Inc. He has been assigned to develop a new
marketing campaign for their clients. If John properly allocates resources it will enable
him to do which of the following?
a. explain to those who support the project necessary contributions
b. ensure resources are available when needed
c. develop accurate and realistic schedules
d. all of the above
Which of the following is required for a project manager to complete successful
personnel planning?
a. identify the skills and knowledge needed to perform a project's activities
b. choose a diversified pool of personnel from various departments
c. ask employees to volunteer for a project
d. none of the above
A skills roster uses which of the following symbols and descriptions to identify the
various skills and knowledge levels:
a. primary capability
b. secondary capability
c. interest
d. all of the above
The results produced per unit of time that project team members spend working on that
activity is known as?
a. efficiency
b. span time
c. activity
d. productivity
Sam, a project manager has been working with his team. However, the team members
are far behind schedule on several tasks. The team members have not been working
efficiently. Which of these is efficiency affected by:
a. ability to switch back and forth among several tasks
b. time spent on personal activities
, c. time spent on non-project general organizational duties
d. both b and c
T/F: People who develop reputations for excellence are often requested for more time
than they are available.
True
Arnold Ludwig, a project manager for Wholesale Furniture, Inc. has just missed his
second project deadline. After a meeting with upper management they have determined
Arnold is overcommitting resources on his projects. Which of the following strategies
would be useful to Arnold to avoid a shortage of available resources?
a. assign all of the work to someone who is reliable
b. have previous project team members assigned to his project
c. hire an external vendor or contractor to perform some of the work
d. none of the above
T/F: Hard workers are easy to find, the more difficult task for upper management is
finding someone who can finish the job.
True
Sean is a project manager for the Hampton School Construction Authority. He has been
receiving bonus payments and free concert tickets from one of the vendors. Under the
Project Management Code of Ethics, Sean should do which of the following:
a. continue to accept payments and tickets, but share them with the entire team
b. report his actions to his team and ask them to remain silent
c. tell the vendor he can no longer accept these payments and say nothing
d. accept responsibility for his actions regardless of the personal consequences
Which of the following powers is far more effective for a project manager:
a. ascribed power
b. technical power
c. achieved power
d. all of the above
A project manager who wants to get the desired results should enlist which of the
following tactics?
a. be specific with team members
b. emphasize the urgency of assignments
c. act with authority
d. all of the above
List the two ways project managers can analyze a resources time.