/. 1. Materials in a Plant 2001 SSA are ___________ funded. - Answer-b. AWCF
/.2. The ERP structure in GCSS-Army uses combinations of organizational elements to
represent SSAs and Units. The ____________ is a designated virtual area within each
plant where planning occurs for an activity. - Answer-b. MRP area
/.3. The physical slot where material resides in Plant 2001 is known as the _________. -
Answer-d. Bin
/.4. The Advance Shipment Notification (ASN) triggers the creation of a (an)
____________. - Answer-b. inbound delivery
/.5. Which source and destination listed below represents a goods receipt going to the
warehouse for putaway? - Answer-c. 902 500000XXXX to RAK WACBA
/.6. Data from transportation or supply discrepancies is automatically transferred to
WEBSDR. - Answer-b. False
/.7. _________________ occurs when a receipted material has open customer
requirements. Rather than be put-away to the storage section only to be immediately
picked, GCSS-Army will send the material to the issue section for placement into the
customer bin for issue. - Answer-d. Cross docking
/.8. GCSS-Army creates a ____________ transfer order when there are no open
customer requirements for a receipted material. - Answer-c. put-away
/.9. When do you see a Putaway ticket with YYY NEW MAT'L? - Answer-d. When the
material does not have a putaway strategy
/.10. Transaction code_____________ is used to reprint a material release order using
the 80 series outbound delivery number. - Answer-b. VL02N
/.11. Balancing IM and WM involves reconciliation between the ___________________.
- Answer-b. Overall SSA system inventory quantity and the system bin quantity
/.12. Which physical inventory indicator designates a cycle of six counts per year? -
Answer-b. An indicator of B
/.13. Transaction code ______ allows a user to view stock by material number. -
Answer-a. LX02
/.14. What is the result of a Post Goods Issue (PGI)? - Answer-a. Reduced SSA stock
after placement in a customer bi