Clean Water Act - (answers)Law set into place in 1970 for storm water regulation
NPDES - (answers)Regulations for monitoring storm water activity on a
construction site, are outlined in
Immediately after project is awarded and before you begin any site work -
(answers)When should you read and understand SWPP
Contaminated ground water - (answers)What is not an allowable storm water
discharge or non-storm water discharge
When jurisdiction of operations specifies you can start - (answers)When may
construction activity begin
303D list - (answers)Waters that fail anti-degradation list are placed on which list.
An officer and project owner - (answers)SWPPPs certification are signed by who
FALSE - (answers)The document that must be completed signed and submitted to
the state to obtain authorization to discharge is the NOT. (T/F)
, 2
All construction has been completed both inside and outside - (answers)NOT can
be filed when
is in charge of daily activities - (answers)Operations on a construction site are the
entity in charge of plans and specification and the entity who?
Stay out of trouble with the law - (answers)Motives for staying in compliance with
storm water objectives?
To protect and preserve beneficial use of U.S. waters, maintaining their clean,
physical and biological integrity - (answers)Objectives of the clean water act are
National Pollutant Discharge Elimination System - (answers)NPDES stands for
Site description and maps, inspection and maintenance procedure. Potential
pollutant sources, schedules of activities, site contact information, plan
certification documents, site contact info and descriptions of controls BMP -
(answers)Which are a component of a good SWPPP
False - (answers)Construction sediment is not considered a potential pollutant
source (T/F)
Project owner, SWPPP designer - (answers)When modifying or substituting a
storm water BMP the contractor must consult with
, 3
False - (answers)NOI must be submitted to the appropriate agency before the
storm water pollution preventive plan is developed (T/F)
False, 303d List - (answers)Name of the list with impaired waters is called totally
daily maximum load (T/F)
It is required by law, it documents storm water management activity on your site,
and it demonstrates your intent to manage storm water on your site -
(answers)You should have a SWPPP for your construction site because?
Site specific - (answers)A well constructed SWPPP for your site should be?
Prior to commencing construction - (answers)The NOI must be submitted when?
Schedule of activities - (answers)One necessary component of a good SWPPP is?
Weather and Climate - (answers)Factors that may impact SWPPP scheduling
activities include
masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
(answers)Pollutant sources on a construction may include
SWPPP STUDY GUIDE FINAL EXAM PREP 2025/2026
ACCURATE QUESTIONS WITH CORRECT DETAILED
ANSWERS || 100% GUARANTEED PASS <LATEST
VERSION>
Clean Water Act - (answers)Law set into place in 1970 for storm water regulation
NPDES - (answers)Regulations for monitoring storm water activity on a
construction site, are outlined in
Immediately after project is awarded and before you begin any site work -
(answers)When should you read and understand SWPP
Contaminated ground water - (answers)What is not an allowable storm water
discharge or non-storm water discharge
When jurisdiction of operations specifies you can start - (answers)When may
construction activity begin
303D list - (answers)Waters that fail anti-degradation list are placed on which list.
An officer and project owner - (answers)SWPPPs certification are signed by who
FALSE - (answers)The document that must be completed signed and submitted to
the state to obtain authorization to discharge is the NOT. (T/F)
, 2
All construction has been completed both inside and outside - (answers)NOT can
be filed when
is in charge of daily activities - (answers)Operations on a construction site are the
entity in charge of plans and specification and the entity who?
Stay out of trouble with the law - (answers)Motives for staying in compliance with
storm water objectives?
To protect and preserve beneficial use of U.S. waters, maintaining their clean,
physical and biological integrity - (answers)Objectives of the clean water act are
National Pollutant Discharge Elimination System - (answers)NPDES stands for
Site description and maps, inspection and maintenance procedure. Potential
pollutant sources, schedules of activities, site contact information, plan
certification documents, site contact info and descriptions of controls BMP -
(answers)Which are a component of a good SWPPP
False - (answers)Construction sediment is not considered a potential pollutant
source (T/F)
Project owner, SWPPP designer - (answers)When modifying or substituting a
storm water BMP the contractor must consult with
, 3
False - (answers)NOI must be submitted to the appropriate agency before the
storm water pollution preventive plan is developed (T/F)
False, 303d List - (answers)Name of the list with impaired waters is called totally
daily maximum load (T/F)
It is required by law, it documents storm water management activity on your site,
and it demonstrates your intent to manage storm water on your site -
(answers)You should have a SWPPP for your construction site because?
Site specific - (answers)A well constructed SWPPP for your site should be?
Prior to commencing construction - (answers)The NOI must be submitted when?
Schedule of activities - (answers)One necessary component of a good SWPPP is?
Weather and Climate - (answers)Factors that may impact SWPPP scheduling
activities include
masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
(answers)Pollutant sources on a construction may include