Georgia Pest Control Test Questions and Answers 100%
Correct
GSPCC - ans -Georgia Structural Pest Control Commission
GDA - ans -Georgia Department of Agriculture
FIFRA - ans -Federal Insecticide, Fungicide, and Rodenticide Act 1947
Regulate the registration and labeling of pesticides.
Amended in 1972 to include classification systems for types of pesticides and created
requirements for:
-Certification of applicators authorized to apply pesticides
-Safety of workers using pesticides
-Protection of environment from contamination by pesticides
-Creation of EPA to administer FIFRA
Requirements for Georgia SPCA - ans -Company License
-All pest management companies must be licensed before they begin operation
Certified Operator
-Every pest management company (branch) must employee at least one person
who has taken and passed the certification exam.
Registered Employees
-all non-certified technicians must be registered, in order to work without the
presence of a certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered
periodically.
Re-certification
-5 years
-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
,-WDO- 8 hours
-FUM- 3 hours
Designated Certified Operators (DCO) Categories - ans -WDO- Wood Destroying
Organisms
HPC- Household Pest Control
FUM- Fumigation
Contracts for Control of WDO - ans -A contract must be issued for every WDO
service before the work begins.
Copied must be kept for 2 years following the expiration of the contract.
Comprehensive Post Construction Soil Termiticide Application for Subterranean
Termites - ans -Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils
Defined Post Construction Soil Termiticide Application for Subterranean Termites
- ans -Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
Post Construction Soil Termiticide Application for Subterranean Termites, Other
than Baits - ans -Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Post Construction Termiticide Bait Application for Subterranean Termites - ans -
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
, Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Pre-Construction Termiticide Bait Application for Subterranean Termites - ans -
Systems must be monitored for one year at no additional cost when installed for
pre-construction or to control infestations found during the coverage period of an
official Georgia Wood Infestation Inspection Report.
Alternate Application Techniques (AAT) - ans -AATs must be approved by the
commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas
specified in defined, comprehensive, or pre-construction treatments
Treatment of Powder Post Beetles and Wood Borers - ans -Application of an
approved pesticide
Ventilation of the under-floor space between the bottom of the floor joists and
the earth to meet the requirements of the International Residential Building Code
for one and two family dwellings
Treatment of Wood Decay Fungi - ans -Ventilation of the under-floor space
between the bottom of the floor joists and the earth to meet the requirements of
the International Residential Building Code for one and two family dwellings
Installation of a vapor barrier to cover a minimum of 70% of the exposed soil
surface in a crawl space
Treatment of Dry Wood Termites - ans -Application of an approved pesticide
Treatment of Schools - ans -Treatment of Schools involves taking special
precautions to minimize the potential exposure of students to pesticides.
-Application of pesticides in rooms vacant for 3+ hours
-Applications of bait formulations, rodenticide baits in tamper-resistant
containers, insecticides when students not in the room.
Correct
GSPCC - ans -Georgia Structural Pest Control Commission
GDA - ans -Georgia Department of Agriculture
FIFRA - ans -Federal Insecticide, Fungicide, and Rodenticide Act 1947
Regulate the registration and labeling of pesticides.
Amended in 1972 to include classification systems for types of pesticides and created
requirements for:
-Certification of applicators authorized to apply pesticides
-Safety of workers using pesticides
-Protection of environment from contamination by pesticides
-Creation of EPA to administer FIFRA
Requirements for Georgia SPCA - ans -Company License
-All pest management companies must be licensed before they begin operation
Certified Operator
-Every pest management company (branch) must employee at least one person
who has taken and passed the certification exam.
Registered Employees
-all non-certified technicians must be registered, in order to work without the
presence of a certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered
periodically.
Re-certification
-5 years
-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
,-WDO- 8 hours
-FUM- 3 hours
Designated Certified Operators (DCO) Categories - ans -WDO- Wood Destroying
Organisms
HPC- Household Pest Control
FUM- Fumigation
Contracts for Control of WDO - ans -A contract must be issued for every WDO
service before the work begins.
Copied must be kept for 2 years following the expiration of the contract.
Comprehensive Post Construction Soil Termiticide Application for Subterranean
Termites - ans -Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils
Defined Post Construction Soil Termiticide Application for Subterranean Termites
- ans -Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
Post Construction Soil Termiticide Application for Subterranean Termites, Other
than Baits - ans -Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Post Construction Termiticide Bait Application for Subterranean Termites - ans -
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
, Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Pre-Construction Termiticide Bait Application for Subterranean Termites - ans -
Systems must be monitored for one year at no additional cost when installed for
pre-construction or to control infestations found during the coverage period of an
official Georgia Wood Infestation Inspection Report.
Alternate Application Techniques (AAT) - ans -AATs must be approved by the
commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas
specified in defined, comprehensive, or pre-construction treatments
Treatment of Powder Post Beetles and Wood Borers - ans -Application of an
approved pesticide
Ventilation of the under-floor space between the bottom of the floor joists and
the earth to meet the requirements of the International Residential Building Code
for one and two family dwellings
Treatment of Wood Decay Fungi - ans -Ventilation of the under-floor space
between the bottom of the floor joists and the earth to meet the requirements of
the International Residential Building Code for one and two family dwellings
Installation of a vapor barrier to cover a minimum of 70% of the exposed soil
surface in a crawl space
Treatment of Dry Wood Termites - ans -Application of an approved pesticide
Treatment of Schools - ans -Treatment of Schools involves taking special
precautions to minimize the potential exposure of students to pesticides.
-Application of pesticides in rooms vacant for 3+ hours
-Applications of bait formulations, rodenticide baits in tamper-resistant
containers, insecticides when students not in the room.