• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Mar 3203 Exam 3 Ch 6, S6, 16 Exam Questions With Correct Answers |Latest Update 100% Solved| Graded A+

Document preview thumbnail
Preview 2 out of 11 pages

MAR 3203 EXAM 3 CH 6, S6, 16 EXAM QUESTIONS WITH CORRECT ANSWERS |LATEST UPDATE 100% SOLVED| GRADED A+

Content preview

MAR 3203 EXAM 3 CH 6, S6, 16 EXAM QUESTIONS WITH CORRECT ANSWERS |LATEST UPDATE
100% SOLVED| GRADED A+




Process Capability Ratio (Cp) relates to the spread (dispersion) of the process output relative
to its tolerance




A capable process Cp greater than or equal to 1




Cp less than 1 process yields products/ services outside their allowable tolerance




2 Six Sigma Cp is equal to or greater than...




Process Capability Index (Cpk) measures the difference between desired and actual
dimensions of goods/ services produced

-standard criterion used to express process performance




Cpk= negative number, 0, or less than 1 process does not meet specifications




Cpk= 1 process meets specifications




Cpk= greater than 1 process is better than the specification requires

, Lean operations supply the customer with exactly what the customer wants when the
customer wants it, without waste, through continuous improvement




Just-in-time (JIT) an approach of continuous and forced problem solving via a focus on
throughput and reduced inventory




Toyota Production System (TPS) emphasis on continuous improvement, respect for people,
and standard work practices

-is particularly suited for assembly lines.



1. eliminate waste

2. remove variability

3. improve throughput 3 issues fundamental to operations improvement




Lean and just-in-time materials arrive where they are needed only when they are needed




lean powerful because it focuses its attention on problems




JIT reduces inventory, cuts variability and waste, improves throughput




Toyota Production System (TPS) continuous improvement, respect for people, standard
work practice

Document information

Uploaded on
April 10, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KateJones
4.8
(12)
Sold
32
Followers
0
Items
5716
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions